Laserfiche WebLink
43 <br />• Cresson Project <br />Reclamation Cost Calculations <br />Area: Post Reclamation Monitoring <br />Ground & Surface Monitoring <br />--------------------------- <br />Labor <br />Travel <br />Rm. & Board <br />Equipment <br />Sample Cost <br />Ground Water <br />Surface Water <br />Sampling Supplies <br /> <br />Vegetation Monitoring <br />--------------------- <br />Labor <br />Travel <br />Rm. & Board <br />Equipment <br /> acres/hr. <br /> Hr./yr. S/hr. Cost <br />2men. 1 wk., quarterly 320 120 38400 <br />4 Trips x S75/trip - - 300 <br />5100/day x 40days - - 4000 <br />1 Pickup @ 58.42/hr. - - 1347 <br />1 Pump (purchased) - - 2000 <br />10 wells x 4 samp./yr. - - 14000 <br />4 locations x samp./yr. - - 5600 <br />5100/trip <br />- <br />- - - 400 <br />-- <br />-- <br />----------------- <br />Total Cost 1st Year ------------------- ------- <br />66047 <br />Cost Last 4 Years (Minus pump) 256188 <br />Total Surface ~ Ground Water Cost 322235 <br />Hr./yr. S/hr. <br />Cost <br />Omen. 2 wk., yearly 320 120 38400 <br />1 Trips x S75/trip - - 75 <br />5100/day x 40days - - 4000 <br />1 Pickup @ 58.42/hr. - - 1347 <br />Total Cost 1st Year 43822 <br />Cost Last 4 Years 175288 <br />Total Vegetation Cost 219110 <br />TOTAL POST RECLAMATION MONITORING 541345 <br />• <br />