Laserfiche WebLink
42 <br />Cresson Project <br />• Reclamation Cost Calculations <br />R <br />f <br />tili <br />i <br />H <br />e <br />er <br />z <br />ng: <br />and Broadcasting Productivity: 1.0 acresjhr. <br /> S/hr S/acre <br />i Labor <br /> 1 Laborer @ 15.87 15.87 <br />Equipment <br />i 1 Pickup @ 8.42 8.42 <br />Materials <br /> <br />--------------------------------- Nitrogen - 200#/Acre @ <br />------------------------ S249/ton <br />-------- 24.90 <br />---------- <br /> Total S/acre 49.19 <br /> Reclaimed Acres 769.5 <br />' Total Cost 37852 <br />Replanting Shrubs and Trees <br />50~ Survival <br />Labor <br />Equipment <br />Materials <br />1 Pickup @ <br />Productivity: <br />1 Laborer @ <br />Goosebury current <br />Ro$a WOOdSI <br />Engleman spruce <br />Quaking aspen <br />1.12 acres/hr.a <br />15.87 14.17 <br />8.42 7.52 <br />21.50 <br />20.50 <br />10.25 <br />10.25 <br />62.50 <br />Total S/acre 84.19 <br />Reclaimed Acres 769.5 <br />Total Cost 64782 <br />Reseeding: Hand Broadcasting Productivity: <br />75`.K Survival Rate <br />Labor 1 Laborer @ <br />Equipment 1 Pickup <br />Materials Seed Mix <br />------------------------------------------------------------- <br />Total S/acre <br />Reclaimed Acres <br />Total Cost <br />~~ <br /># R.S. Means. Site Work & Landscape Cost Data, 1994. pg. 108. <br />1.0 acres/hr. <br />15.87 15.87 <br />8.42 8.42 <br />71.75 71.75 <br />---------96.04 <br />769.5 <br />73903 <br />176537 <br />i <br />