Laserfiche WebLink
u <br />Haulage Detail <br />Reclamation Cost <br />Area: Cresson Pit <br />Topsoil Haulage Detail <br /> Equip. <br />--------- - Number <br />------- <br />Haul Topsoil: <br />Zone 1 A 7738 2.0 <br />Zone 1 B 7738 2.0 <br />Zone 2 A 7738 2.0 <br />Zone 2 B 773B 2.0 <br />Zone 3 7738 3.0 <br />Pit Bottom 7738 3.0 <br />Interior Haul <br />-- <br />- Rd 7738 2.0 <br />- <br />------------ <br />Total --------------- ------- <br /> <br /> <br /> Prod. Labor Equip. Material Hourly Total <br />Units <br />------- Rate <br />---------- Hours <br />-------- Cost <br />--------- Cost <br />-------- Cost <br />---------- Cost <br />--------- Cost <br />--------- <br />4818 268.5 9 17.83 106.95 0.00 124.78 2239 <br />7461 172.8 22 17.83 106.95 0.00 124.78 5388 <br />13851 210.6 33 17.83 106.95 0.00 124.78 8207 <br />2259 186.6 6 17.83 106.95 0.00 124.78 1511 <br />26194 165.0 53 17.83 106.95 0.00 124.78 19809 <br />65597 123.3 177 17.83 106.95 0.00 124.78 66384 <br />14420 <br />-- <br />-- 160.2 <br />- <br />-- 45 <br />- <br />- 17.83 <br />- <br />- 106.95 0.00 124.78 11232 <br />- <br />-- <br />134600 --- <br />--- <br />- - <br />---- <br />-- <br />345 - <br />--- <br />-- --------- --------- ---------- -------- <br />114769 <br />r <br />