Laserfiche WebLink
Mr. Sandra L Broar <br />Diwion oJMiarm[r and Geology <br />Marrb 11, 7001 <br />Page 3 <br />u <br />Regpoose: The OSM-AVS database should now show the following dates for George Holway, <br />VP and CFO, Begin - 06/19/98 and End - 10/20/99, which is depicted on the revised pages 2 <br />and 3 for P&LCHC. He was reelected only as a VI' with a new Begin Date of 10/20/99, which is <br />the proper listing on the revised page 1 for P&LCHC. <br />6. In Attachment 3-5 (date 6/ 14/00), Richard A. Navarre it Grted ar Via Pnaident with a Begin and End <br />Dare aj6/4/98 - 10/20/99. Re'chard A. Navam fr not Gaud in AVS. Pleare bare AVS npdar<d to <br />rcfkct Richard A. Navarre ar bv/deng a Via Prerident poriu'ore. <br />Response: The OSM-AVS database should now show the following dates for Richard Navarre, <br />VP, Begin - OG/04/98 and End - 10/20/99, which is depicted on the revised page 3 for <br />P&LCHC. He was reelected as a VP and CFO, with a new Begin Date of 10/20/99, which is the <br />proper listing on the revised page 1 for P&LCHC. <br />In AVS, a Janette I. Pu[Z tr Grted ar Arrfrtanl Trearun wi[h a Begin Dale oj3/15/00. Pkare revfre <br />A[tachment 3-5 (Dated 6/ 14/00) to chow that Janette I. Putt ei holding chic porition. <br />Response: AVS was updated based on the contents of the July 14 cover letter see page 1, and is <br />depicted on the revised page 2 for P&I.CHC. <br />RULE 2.04.13 -ANNUAL RECLAMATION REPORTS <br />8. SCC bar bcen nrbmitkng mapr rhoaxng the recaamation pharer of [he Seneca II-lY/ mi'ne irr repam[e <br />• AUTOCAD filet. I[ would be much taxer jor the DMG [a nrrtew if SCC ured one file urt'[h a repamte !aver <br />for each phase. For example, ane Dryer jor backfi!!ed and graded, one layer for loproil removed, one layer for <br />[oproil replaced, ane layer for nrregetated arcar vnd throb plnU and ane Dryer for exiting topography avxld <br />a'mpGjy the review. Please rounder ruing one AUTOCAD fife with reparale nc/amalian /ayerr beginning <br />ws'!l~ the rubmitml ojthe 1000 Annual Reclamation RepoK. <br />Regpoose: SCC will take this suggestion into consideration when we compile the infomtation and <br />exhibits for the 2000 Annua] Reclamation Report. <br />RULE 2.05.3 -OPERATION PLAN AND RULE 2.05.4 -RECLAMATION PLAN <br />9. The Pond 006 Arc-re[tGng baan war approved ar a temporary rbur[ure which avoid be reclaimed ono <br />reclamation ack'intier ojthe mine area had prognrred far enough to [hal t[ it na longer required (Attachment <br />134B, page 9). In TR-35, approved in June 1000, SCC nrbmitted the phase V derignr jor Pond 006. In <br />that reu ton SCC stated that the design showy [hat the pre-set[G'ng barin it no longer required, brr[ SCC fs rtill <br />evaluating if any more roal remora! wiG take plan a! [he bottom oj[he `B "pf[. IY/hat bar SCC Beaded about <br />mining tbfr area? Please rubmft a reveled mining/reclamation rchedule rhoaz'ng [he mining, ff applicable, and <br />reclamation ojdre lvuKr B pit. <br />Respoose: SCC is finalizing our response to this comment and will submit it to the Division in a <br />separate package in the next few weeks. <br />• RULE 2.05.4 -RECLAMATION PLAN AND RULE 4.14.1. - BACKFILLING AND <br />GRADING <br />