Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT fi SPECIAL HANDLING <br />Task p~ Task Desczintion <br />39 ~ Topsail all dis[u rbed areas <br />40 ~ Cover Refuse Pile wr th Subsoil <br />62 ~ Distribute topsoil over pad, pits, and roads <br />66 ~ Replace topsoil over drill pad ~ <br />69 ~ Salvage topsoil from 1.2 mill.gal.water tank pad <br />]1 ~ Replace topsoil on 1.2 mill gal. water tank pad <br />9BA ~ Respread topsoil on material storage bench ITRp6]) <br />]3 ~ Replace topsoil on Lone Pine Gulch Fan bench <br />205 ~ MR-200; Replace Topsoil on DMEA Powerline Road <br />301 ~ MR-209; Replace Topsoil on Lone Pine Gulch pipel ine~ <br />221 Replace topsoil on shaft site and elec. borehole rd~ <br />222 ~ Replace topsoil from stockpile pl <br />223 ~ Replace topsoil Erom stockpile q3 <br />229 ~ Replace topsoil from stockpile q9 ~ <br />225 ~ Replace topsoil from stockpile HS <br />Cost 15l <br />$15],44'] <br />$33,083 <br />51,190 <br />$230 <br />$315 <br />$210 <br />$23,]49 <br />$4,193 <br />$311 <br />$3]B <br />S SB, 900 <br />$91,823 <br />$18, B90 <br />$3, ]]B <br />$153 <br />Subtotal (JI: $399,555 <br />sheet 6 of 10 <br />