Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />K. PORTAL/SHAFT SEALI.\G <br />Task #~ Task Description ~ Cost 1$) <br />41 Seal 6 Mine Entries ~ 555,369 <br />~ Inl cudes portal entries and ven[i lation opening ~ <br />B3 ~ Haul material to backifll portals in Lone Pine ~ 59,909 <br />91a ~ Seal Portals associated with Lone Pine Area ~ 515,735 <br />241 ~ Seal downcomer pipes on SGFA intake /e:cha us[ ~ 52,997 <br />242 ~ Seal SGFA int ake/exhaust shafts ~ 561,529 <br />Subtotal IM,): $139,979 <br />L. DRILL HOLE/MONITORING WELL INSTALLATION AND/OR SEAhING <br />Task q~ Task Description <br />42A ~ Seal Deep Drill Holes <br />92B ~ Seal Inte rmedia[e Drill Holes <br />42C ~ Seal Shallow Drill Holes <br />42D ~ Seal piezometer associated with MR#129 <br />42E Seal and plug Exploration Site S <br />42F Seal and plug borehol es for vat er tank <br />92G Seal soils borrng holes 6 piezometers (MR#1681 <br />42I <br />92J <br />Reclaim 1 Soil Boring Hole (MR-184) <br />Reclaim 5 Shallow Wetland Ho1ea IMR-189) <br />Reclaim Exploration Holes IMR-183) <br />MR-187; Seal fi Plug Drillholes (EE-Twin) <br />Regrade Drill Pads 6 Access Roads <br />Replace Topsoil <br />Subtotal IL): <br />Cosc (51 <br />59,317 <br />$8,359 <br />53,261 <br />51,905 <br />52,962 <br />52,987 <br />52,418 <br />~ 557 <br />$103 <br />561,559 <br />$1,203 <br />$299 <br />$299 <br />$94,224 <br />sheet 7 of 10 <br />