Laserfiche WebLink
RECLAMATION COST SUMMARY conC d <br />I. EARTHWORA - DRASNAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task #~ Task Description <br />28A ~ Sediment Pond DID-1 <br />29 ~ Sediment Pond DID-2R <br />30 ~ Sediment Pond MH-3 <br />31 ~ Sediment Pond MB-9 <br />32 ~ Sediment Pond PID-E <br />33 ~ Sewage Treatment Pond <br />39 ~ Freshwater Pond FW-1 <br />Cost ($I <br />$16,525 <br />$19,631 <br />$1,994 <br />~ $73 <br />$]43 <br />$13 <br />$9,255 <br />53a ~ Backf ill MB-1 and FW-1 Emergency Spillways ~ $692 <br />35 ~ Diversion Ditches DCW-lA and SB and D1-6 ~ $1,376 <br />76 ~ All Sediment Ditches <br />Install riprap in permanent <br />3BA ~ DCW-2 <br />3HD ~ Remove riprap aC Bear Mine <br />$135 <br />diversion ditches: <br />pl <br />3BE ~ Remove brush pile at Bear Mine 31 <br />3RP ~ Rill & Gully repair during <br />1$4].99; (D3H;) (200 hours <br />MR-1]7~ Portal Bench Drainage Design <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />liability period <br />(MR-1771 <br />Su bto[al (11: <br />$1],900 <br />$1,896 <br />$1,873 <br />$9,59H <br />$2,057 <br />$77.711 <br />sheet 5 of 10 <br />