Laserfiche WebLink
us <br />HOURLY PRODUCTION: <br />Job Condition Corrections <br />Alt. _ ],000 ft. <br />Alt. adjustment ........... <br />Job efficiency ... (lsh/dl <br />Net Corrections <br />Load Equipment Capacity <br />_______________________ <br />Rated caps etty <br />Bucket fill factor <br />Adjusted capacity <br />Ttuck Capacity <br />Sheet 2 of 3 <br />Track/Load Team Support Equipment <br />Truck Loader Loatl Area Dump Area <br />________________________________________ <br />1.000 1.000 N/A 1.000 <br />0.830 O.B30 N/A 0.830 <br />U.d30 U.B30 N/A O.B30 <br />4.500 LCY Inomi na] heaped) <br />-------- Fill material description: <br />0.900 Other - soil, boulders, roots (BO-100FI <br />4.050 LCY <br />We rght Basis: ~ Volume Basis: <br />Material weigh[ = 2,550 lbs/LCY ~ Struck capacity = 8.00 <br />Mat. description -------- ~ Heaped capacity = 10.00 <br />Earth - Dry packed ~ ------- <br />____________________________________ ~ Average = 9.00 LC'Y <br />Rated payload = 26,000 lbs. ------- <br />Payload volume = 10.20 LCY ~ Max. Avg. Volume = <br />____ <br />_ I 9.00 <br />____ <br />_ LCY <br />___ <br />Adj. truck volume based on discreet no. of loader passes __ <br />8.10 LCY <br />Load Equ rpment Cycle Time <br />Number of discreet loader passes required to fill truck 2 <br />Track loaders- ------- <br />Load ma tetial descrip [eon: N/A <br />________________________________ <br />Excavators/Shovels - cycle time vs. job condition rating: _________ <br />N/A _ <br />- selected value withrn basic rating N/A <br />Track loaders - basic cycle time elements: Load time = N/A min. <br />Maneuver time = N/A <br />Dump trme = 0.09 <br />Unatljusted Basic Cycle time = 0.500 men. <br />Wheel/Track loaders- ------- <br />Cycle Time Factors: Description Factor (min.I <br />Material -Mixed material 0.020 <br />Pile condition -Conveyor of dozer piled 10'h and up 0.000 <br />Truck Ownership -Common ownership of trucks 6 loaders -0.040 <br />Operation -Constant operation -0.040 <br />Target -Nominal target 0.000 <br />Net cycle time adj. _ -0.060 min. <br />Adjusted Basic Cycle Time = 0.990 min. <br />Total load time pea truck incl. exchange time adj.• 0.530 min. <br />•(bulk of 1st pass completed during truck exchange) ------- <br />