Laserfiche WebLink
Colorado Drvrs ion of Minerals and Geology <br />_________________________________________ <br />ESTIMATING FORM - TRUCK/LOADER TEAMS <br />Sheet 1 of 3 <br />Task No. 225 Prep. By: SLB Permit No. C-RO-007 <br />__________ _________ ________ <br />Date 04 /2 B/9] Filename: 0007-225 Operation: Nest Elk Mrne <br />Pe tm rt Action Permit Revision No. 7 <br />_____________________________________________________________ <br />Task Description Replace topsoil from Stockpile p5 <br />HOURLY EQUIPMENT COSTS: <br />_________°------------ Single, Doub le or Triple <br />County: GUNNISON Labor Zone <br />____________ 2 <br />______ ShiECS S <br />__ <br />__ <br /> <br />Equipment __ <br />Descrip[ _ <br />rons ____ _ <br />Truck/loatl team - Truck GENERIC lOt, 7. 5 to 10.4 cy, on o r oEf-highway <br />- Loader CAT 966F <br />Support equip. - Load area: N/A <br />- Dump area: CAT DBN with SEMI-U blade <br />Road ma int. - Grader CAT 12G w ith BOPS cab <br />- Water T. 1,500 gal . on or o ff highway <br />__________ <br />Trvck/Load Team _________ <br />Support _____________ <br />Equipment ______ <br />Road _____________ <br />Maintenance <br />Trvck Loader Load are a Dump area Grade r Water T. <br />Equipment Filename: lOCYHLTK <br />________ 966FLODR <br />________ N/A <br />________ DBN -S DZR <br />________ 12G-- <br />______ ROP 1-EKWATR <br />___ _______ <br />Utilization on job <br />-Machine: 92i 100k N/A 1004 2Ei 26i <br />-Ripper N/A N/A N/A N/A N/A N/A <br />Cost Breakdown <br />______________ <br />Ovne rship cost/hr: $12.90 <br />526.89 <br />N/A <br />$40.05 <br />$16 <br />.60 $5.91 <br />ope ra trng cost /h r: $14.03 529.25 N/A $51.6] $4 .55 $3.Ou^ <br />Ripper Op. cost/hr: $0.00 50.00 N/A $0.00 $0 .00 $D.00 <br />Operator cost/h r: $20.9] 522.09 N/A $22.95 $23 .17 $20.]8 <br />Unit subtotals $4].90 $]3.1] N/A 5119.67 $49 .28 529.65 <br />k of sap. units 3 1 0 1 1 1 <br />Group subtotals- T/L team $216.88 Support: $114.6] Rd. Main[.: $]3.9] <br /> <br />Total Work Team Cost/Hr _________ <br />$405.52 _________ _________ <br />MATERIAL QUANTITIES: <br />Beg. <br />Volume: 120 CCY <br />Cu.Yd. ---------- Swell Loose <br />Volume: 120 CCY Factor: 1.125 Volume: 135 LCY <br />__________ __________ ___________ <br />Source of quantity take-off: Page 2.05-53 <br />Source of est. swell factor: Division estimate, dry packed earth <br />