Laserfiche WebLink
us <br />Truck Cycle Time <br />Exchange = 0.60 <br />Load = 0.530 <br />Maneuver 6 dump = 1.00 <br />Travel Time (haul 6 return): <br />Road cond. descr.:Firm, smoo <br />Haul route <br />Road Length Grade <br />seg. q (ftl res. ~k) <br />____________________________ <br />1 600 -8.30 <br />Sheet 3 of 3 <br />min. Adj. for altitude = 0.60 min. <br />min. = 0.53 min. <br />min. ^ = 1.00 min. <br />th, rolling dirt/lt. surfaced road, maintained <br />Rolling Total Velocity Travel Cime <br />res. (kl rea. (tl (Epml (mrnl <br />__________________________________________ <br />3.00 -5.30 2690 0.4'1 <br />Haul time = 0.9] min. <br />Return route ------ <br />______________________________________________________________________ <br />1 600 8.30 3.00 11.30 1]01 0.51 <br />•lst S last seg. adj. for accel. /decel. Re [urn nme = <br />Total Trv ck Cycle Time = <br />Loader Unit Prod.= 430.09 LCY/Hr - Adj. for efficiency= <br />Truck Unit Prod.= 156.14 LCY/Hr - Adj. for efficiency= <br />Optimal number of trvcks per loading unit <br />Selec [ed number of trucks per loading unit <br />Hourly [ruck team production <br />Ne[ Hourly Truck/Loader Team Production <br />Net Hourly Mu 1[iple T/L Team Production <br />JOB COST: <br />Fleec size <br />Unrc Cosc <br />0.51 min. <br />3.11 min. <br />316.99 LCY/Hr <br />129.61 LCY/Hr <br />3 <br />3 <br />3BB. B3 LCY/Hr <br />356.9'1 LCY/Nr <br />356.9] LCY/Hr <br /> 1 T/L Team(s) Total Jab Time: 0.38 HouYs <br />$1. 134 /LCY Total Job Cosc: $153 <br />