My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07092
DRMS
>
Back File Migration
>
Revision
>
REV07092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:01 AM
Creation date
11/21/2007 9:39:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
4/29/1997
Doc Name
WEST ELK MINE C-80-007
From
DMG
To
MIKE BOULAY
Type & Sequence
PR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u3 <br />Truck Cycle Time Sheet 3 of 3 <br />________________ <br />Exchange = 0.60 min. Adj. for altitude = 0.60 min. <br />Load = 0.530 min. = 0.53 min. <br />Maneuver fi dump = 1.00 min. 1.00 min. <br />Travel Time lhaul s returnl: <br />Road cond. descr.:Firm, smooth, rolling dire/lt. surfaced road, mai nta rued <br />Haul route <br />Road Length Grade Rolling Total Velocity Travel time <br />seg. q IfU res. 1~) res. (k1 res. (k1 (fpml (min) <br />______________________________________________________________________ <br />1 1.950 -3.80 3.00 -0.80 3360 0.79 <br />______________________________________________________________________ <br />Haul Cime = 0."19 min. <br />Return route ------ <br />1 1,950 3.8C 3.C0 6.80 2'193 0.93 <br />•lst fi last seg. adj. for accel./decel. Return time = 0 .93 min. <br />Total Truck tyc le Time = 3 .85 min. <br />Loader Unit Prod.= 470.09 LCY/Hr - Adj. for efficiency= 356 . 9T LCY/Hr <br />_________ <br />Truck Uni[ Prod.= 126.36 LCY/Hr - Adj. for efficiency= _____ <br />109 ___ <br />.88 <br />LCY/Hr <br />_________ <br />Optimal number of trucks per loading unit _____ ___ <br />3 <br />Selected number of trucks per loading unit 3 <br />Hourly truck team production 319. 65 LCY/Hr <br />Net Hourly Truck/Loader Team Production 319. 65 LCY/Hr <br />NeC Hourly Multiple T/L Team Production 314 65 LCY/Hr <br />JOB COST: <br />c Fleet aixe ] T/L Teamis) Total Job Time: 46. 98 Hours <br />________ <br />Unit Cost $1.292 /LCY Total Job Cost: _________ <br />$18,890 <br />
The URL can be used to link to this page
Your browser does not support the video tag.