21A <br />Colorado Division of Minerals and Geology <br />ESTIMATING FORM - TRUCK/COMER TEAMS <br />Task No. 224 Prep. By: SLB Permit No. C-80-007 <br />Equipment Oescri pions <br />Oa[e 09/28/9'1 Filename: 0007-224 Operation: West Elk Mine <br />Permit Action Permit Revision No. 7 <br />_____________________________________________________________ <br />Task Descrip[ron Replace topsoil from Stockpile q9 <br />_____________________________________________________________ <br />HOURLY EQUIPMENT COSTS: <br />________:_____~___:__= Single, Double or Triple <br />County: GUNNISON Labor Zone 2 Shifts S <br />Truck/load team - Truck <br />- Loader <br />Support equip. - Load area <br />Dump area <br />Road mains. - Grader <br />- Water T. <br />Thick/Li <br />Trvck <br />Equ ipmen[ Filename: lOCYHLT'K <br />Utilization on job <br />-Machine: 93k <br />-Ripper N/A <br />Cost Breakdown <br />Sheet 1 of 3 <br />GENERIC 10[, 7.5 to 10.9 cy, on or off-highway <br />CAT 966E <br />N/A <br />CAT DBN with SEMI-U blade <br />CAT 12G with ROPS cab <br />1,500 gal. on or off highway <br />lad Tedm <br />Loader <br />966FLODR <br />100k <br />N/A <br />Support Equipment <br />Load area Dump area <br />N/A DBN-SUZR <br />N/A 100k <br />N/A N/A <br />Road Maintenance <br />Grader Water T <br />12G--ROP 1-6KWATK <br />25k 25k <br />N/A N/A <br />Ownership cost /hr: $12. 90 $26 .89 N/A 590 .05 S16. 60 $5. 91 <br />Operating cost/hr: $14. 28 $24 .25 N/A 561 .67 $9. 55 $3. 00 <br />Ripper Op. coat/hr: $0. 00 $0 .00 N/A $0 .00 50. 00 $0. 00 <br />Operator cost/ht: $20. 97 $22 .04 N/A $22. 95 523. 13 52C. 78 <br />Unit subtotals $48. 15 $73 .17 N/A $114 .6] 544. 28 $29. 69 <br />__ <br />q of eqp. units ____ <br /> <br />__ __ <br />7 <br />__ _____ <br /> <br />_ ___ <br />1 <br />___ ________ <br />0 <br />____ _____ <br /> <br />__ ___ _ <br />1 <br />__ ______ <br /> <br />__ __ <br />1 <br />__ _____ <br /> <br />_ __ <br />1 <br />__ <br />Group subtotals- T/L team $410 .21 Support: 5119. 67 Rd. Main[ .: _ <br />$"13. 97 <br /> <br />Total Work Team Cos[/Hr _ _____ <br />$598. ___ <br />85 _ ______ __ _ _____ __ <br />MATERIAL QUANTITIES: <br />Beg. <br />Volume: 2,000 CCY <br />N.Yd. ---------- Swell Loose <br />Volume: 2,000 CCY Factor: 1.125 Volume: 2,250 LCY <br />Source of quantity take-off: Page 2.05-53 <br />Source of est. swell factor: Divie ion estimate, dry packed earth <br />___________________________________________________ <br />