Laserfiche WebLink
ZL3 <br />HOURLY PRDDUCCIDN: Sheet 2 of 3 <br />Job Condition Corrections <br />---- --------------------- Truck/Load Team Support Equipment <br /> Truck Loader Load Area Dump Area <br />Alt . _ ], U00 ft. ____.,_____ ________________________________ <br />Alt . adjustment ...... ..... 1.000 1.000 N/A 1.000 <br />Job efficiency ... (lsh/d7 O.a30 U. 830 N/A 0.830 <br /> Net Corrections O.B3B 0.830 N/A 0.830 <br />Load <br />__ Equipment Capacity <br />__ <br />____ <br />___ <br />__ _____ <br />_____ <br />Rated capacity 9.500 LCY (nominal heaped) <br /> -------- Fill material description: <br /> Bucket fill Factor 0.900 Other - soil, boulders, roots 180-100k) <br /> Adjusted capacity 9.050 LCY <br />Trv ck Capacity <br />______________ <br />Weigh[ Basis: <br />Volume Basis: <br />Material weight = 2,550 lbs/LCY ~ Struck capacity = 8.00 <br />Mat. description -------- ~ Heaped capacity = 10.00 <br />Earth - Dry packed ~ ------- <br />____________________________________ ~ Average = 9.00 LCY <br />Rated pay) oatl = 26,000 lbs. ~ ------- <br />____-___ <br />Payload volume = 10.20 LCY ~ Max. Avg. Volume = <br />9.00 <br />LCY <br />Adz. truck volume based on discreet no. of loader passes 8.10 LCY <br />Load equipment tyc le Time <br />_________________________ <br />Number of diet reet loader passes required to fill truck <br />2 <br />Track loaders- ------- <br />Load ma Cerial description: N/A <br />__ <br />__ <br />_____ <br />______ <br />_______ <br />__ <br />_______ <br />_____ <br />___ <br />Excavators/Shovels - cycle time vs. job condition rating: __ <br />N/A _ <br />- selected value within basic rating N/A <br />Track loaders - basic cycle Came elements: Load time = N/A min. <br />Maneuver time = N/A <br />Dump time 0.09 <br />Unadjusted Basic Cycle time = 0.500 min. <br />wheel/Track loaders- ------- <br />Cycle Time Factors: Dese tipCion Factor (min.) <br />Mace rial -Mixed material 0.020 <br />Pr le cond reron -Conveyor or dozer piled 10'h and up 0.000 <br />Truck Ownershrp -Common ownership of trucks 6 loaders -0.090 <br />Operation -COnsta nc operation -0.090 <br />Target -Nominal to tgeC <br />___ <br />___ <br />_ <br />__ 0.000 <br />______ <br />__ <br />______ <br />________ <br />________ <br />_______ <br />Net cycle Came adj. _ _ <br />-0.066 min. <br />Adj ue Ced Basic Cycle Time = 0.990 min. <br />Total loatl time per trvck incl. exchange time adj .• 0.530 min. <br />•(bulk of 1st pass completed during [ruck exchange) ------- <br />