Laserfiche WebLink
7.~1 <br />Colorado Division of Minerals and Geology <br />ESTIMATING FORM - TRUCK/LOADER TEAMS <br />Task No. 223 Prep. 6y: SL6 Pexmi[ No. C-SJ-JJ7 <br />Dale 09/28/97 Filename: 0007-223 Ope rac ion: West Elk Mine <br />__________ __-______ _____________ <br />Permit Action Fermit Revision No. 7 <br />Sheet 1 of 3 <br />Task Description Replace topsoil from Scockpile p3 <br />HOURLY EQUIPMENT COSTS: <br />______________________ Single, Double or Triple <br />County: GUNNISON Labor Zone 2 Shifts S <br />____________ ________ __________ <br />Equipment Descripcions <br />Truck/load ceam - Truck GENERIC lOt, 7.5 [0 10.9 cy, on or off-highway <br />- Loader CAT 966E <br />Support equip. - Load area: N/A <br />- Dump area: CAT DBN with SEMI-U blade <br />Road ma int. - Grader CAT 12G with ROPS cab <br />- Water T. 1,500 gal. on or off highway <br />Truck/Load Team Support Equipment Road Ma lntenance <br />Truck Loader Load area Dump area Cradet k'a ter T. <br />Equ ipmen[ Filename: 10CYHLTK 966FLODR N/A DBN-$DZR 12G--ROP 1-6KWATK <br />Ucilization on rob <br />-Machine: 100k BBk N/A 100k 25k 25k <br />-Ripper N/A N/A N/A N/A N/A N/A <br />Cost Breakdown <br />Ownership cost/hr: $12.90 526.89 N/A $40.05 $16.60 $5.91 <br />Operating cost /hr: $15.29 521.37 N/A $51.6"1 $9.55 $J.00 <br />Ripper Op. cos[/hr: $0.00 $0.00 N/A $0.00 $0.00 $0.00 <br />Operator cost/h r: $20.97 $22.09 N/A $22.95 523.13 520.78 <br />Unit subtotals 599.16 $70.29 N/A $114.67 599.28 529.69 <br />________ ________ ________ ________ _________ _______ <br />q of eqp. units 3 1 0 1 1 1 <br />____ _--- __-_ ____ ____ ____ <br />Group subtotals- T/L team $217.76 Support: 5119.67 Rd, Main[.: $'13.97 <br />Total Work Team Cost/Hr $406.40 <br />+IATERIAL QL`ANTITI ES: <br />Beg. <br />Volume: 13,000 CCY <br />Cu.Yd. ---------- Swell Loose <br />Volume: 13,000 CCY Factot: 1.125 Volume: 14,625 LCY <br />Source of quantity cake-off: Page 2.05-63 <br />Source of est. swell Eactor: Division es[imace, dry packed ea r[h <br />