Laserfiche WebLink
~o <br />NET JOB HOURS ESTIMATING FORM con['d <br />sheet 2 of 6 <br />TASK ~ ~ TASK I EQUIPMENT ~ CPM. ~ "IET <br />NUMBER TASK D£SCRI PTION HOURS USED ~ CHARTING JOB HOURS <br />38E Remove brush pile ® Bear Mine pl 8. 60 NA ~ 10.95 0. 00 <br /> 39 Topsoil all disturbed areas 292. 96 1-T/L Team --------> 292 .96 <br /> 90 Covet re Evse p11e with subsoil 116. 05 ~ 1-T/L Team 123.24" 0. 00 <br /> 91 Install portal seals, drainage pipes, 6 backf ill 96. 00 NA 96.00" 0. 00 <br />42A Seal all drilled holes (deep) 29. 00 NA 29.00" 0. 00 <br />92H Seal all drilled hole (inte rmedlace) 25. 00 NA 25.00" 0. 00 <br />42C Seal all drilled holes (sha110w) 12. 50 NA 12.5" 0. 00 <br />92D Seal piezometers associated with MRq 124 0. 00 NA 8.00" 0. 00 <br />92E ~ Seal and plug Exploration Site S ~ B. CC ~ NA ~ 8 AO" , 0. 00 <br />92F Seal and plug boreholes for water tank 0. 00 NA 8.00" 0. 00 <br /> 93 Demolish fi remove all on-site structures 1,056. 00 NA ----- --> 1,056. 00 <br /> 45 Substation Road 0. 12 1-CAT DBN ----- --> 0. 12 <br /> 46 Main Access Road to Substation 9. 33 1-CAT DBN --------> 9. 33 <br /> 97 Haul/Access Road from Hwy 133 [o Sly Gulch Fan Rd 35. 19 1-CAT DBN --------> 35. 19 <br /> 50 Haul coal ® new sta cktube [o refuse pile 295. 03 1-T/L Team --------> 245. 03 <br /> S1 ~ Haul coal ® s[ack[u bes to ref ues pile 311. 06 1-T/L Team --------> 311. 86 <br /> 53 Backfill hID-1 and FW-1 Emergency Spillways 6. 31 1-CAT DBN --------> 6. 31 <br /> 76 Drill Seed most areas of mine site 110. 00 NA --- - --> 110. 00 <br /> 77 Broadcast Seed small areas NA NA <br /> 70 ~ Hydroseed slopes greater than 3v1 I ~ NA ~~ NA ~ <br /> 79 Broadcast Seed riparian areas NA NA <br /> 00 I Plan[ shrub tublins in all areas except riparian I I NA I NA I <br /> B1 Pla nc shrub tublings in riparian areas NA NA <br /> 44 Haul equipment to and from job site 10. 68 NA ~ --------> 10. 68 <br /> 60 Regrade drill pads and mud pits IMR#125) 3. 06 1-CAT DBN --------> 3. 06 <br /> 61 Regrade Dt ill Roads IMRg125) 6. 70 1-CAT DBN --------> 6. ]e <br /> 62 Distribute topsoil over pad, pies, and roads 9. 3] 1-CAT DBN --------> 9. 3] <br /> 63 Reseed drill pads and roads (MRp125 and MRg126) 9. 00 NA NA B. oo <br /> 69 Rip pad and roads (MRg125) 2. 93 1-CAT DBN --------> 2. 93 <br /> 65 Regrade drill pad and mud pits (MR#126) 3. 06 1-CAT DBN --------> ~ 3. 06 <br /> 66 ~ Replace topsoil over drill Fad (MRq 1261 ~ 1. 09 ~ 1-CAT DBN ~ --------> ~ 1. 09 <br /> 67 Rip dri 11 pad Eor water tank boreholes O. SB 1-CAT DBN --------> 0. 50 <br />94A Haul equipment co and from job site (TRg671 2. 67 NA --------> 2. 67 <br />9BA Res pread topsoil on material storage bench 92. 16 2-CAT 637EI --------> 92. 16 <br /> 49 Backfill portal access road ~ 18. 85 ~ 1-CAT DBN ~ --------> ~ 18. 85 <br />52A Backfill and grade storage bench 166. 63 2-CAT 637EI 166.63" 0. 00 <br /> 53 Rip storage bench access road ~ 0. 62 1-CAT DBN --------> ~ 0. 62 <br /> 54 Rip truck pull-out lane 0. 16 1-CAT DBN --------> 0. 16 <br /> 55 Rip portal access road )only portion E. of portal) 0. 99 1-CAT DBN --------> 0. 94 <br /> 56 Backfill storage bench access road 0. 12 1-CAT DBN --------> 8. 12 <br /> 5] Rip materials storage bench 5. 69 1-CAT DBN --------> 5. 69 <br />44C ~ Mobilize equipment for ?R#69 ~ 2. 57 ~ NA ~ - ------> ~ 2. 67 <br /> 50 Backfill Lone Pine Gulch Fan Bench 266. 94 1-CAT DBN --------> 266. 94 <br /> 59 Rip Lone Pine Gulch Fan pad and staging area ~ 4. 69 1-CAT DBN --------> 4. 69 <br /> 73 Replace topsoil on Lone Pine Gulch Fan Bench 7. 23 2-CAT 637EI --------> ]. 23 <br /> 79 ~ Reconstruct rd thrv Lone Pine Ean 5 staging area ~ 1. 1U ~ 1-CAT DBN ~ --------> ~ 1. 1G <br /> 75 ~ Rip rd section to be reclaimed at Lone Pine fan ~ 0. 06 ~ 1-CAT DBN --------> 0. 86 <br /> 02 I Backfill rd to be reclaimed ® Lone Pine fan I 1. 10 I 1-CAT DBN I --------> I 1. 10 <br /> 83 Haul material [e back Etll portals in Lone Pine 2. 38 1-T/L Team 2.38" 0. 00 <br /> TOTAL TASK HOURS - 2: 2,953. 99 NET PROJECT HOURS- 2: 969. 20 <br />