My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07092
DRMS
>
Back File Migration
>
Revision
>
REV07092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:01 AM
Creation date
11/21/2007 9:39:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
4/29/1997
Doc Name
WEST ELK MINE C-80-007
From
DMG
To
MIKE BOULAY
Type & Sequence
PR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~o <br />NET JOB HOURS ESTIMATING FORM cont'd sheet ] of 6 <br />TASK ~ ~ TASK ~ EQUIPMENT ~ CPM ~ NET <br />NUMBER ~ TASK DESCRIPTION ~ HOURS ~ USED ~ CHARTING ~ JOB HOURS <br />42C ~ Seal and abandon soils bon ng holes 6 pie zome[ers~ 10. 00 ~ Drill Rig ~ ~ 0. 00 <br />42I ~ Reclaim 1 Soil Boring Hole ~ 1. 00 ~ Da 11 Rig ~ ~ 0. 00 <br />92J ~ Reclaim 5 Shallow Wetland Holes ~ 2. 00 ~ Dri 11 Rrg ~ ~ 0. 00 <br /> 49 ~ Backf ill Portal Access Road ~ 27. OB ~ 1-CAT DBN ~ --------> ~ 2]. 08 <br /> 6B ~ Regrade 1.2 mLll.ga. water tank pad ~ 3. ]6 ~ 1-CAT DBN ~ ----- - -> ~ 3. 76 <br /> 69 ~ Salvage Topsoil from 1.2 mill .ga. water tank pad ~ 2. 59 ~ 1-CAT DBN ~ --------> ~ 2. 59 <br /> 71 ~ Replace topsoil on 1.2 mill. gal. water truck pads 1. 73 ~ 1-CAT DBN ~ --------> ~ 1. ]3 <br /> 72 ~ Rip 1.2 mrll. gal. water ca nk pad ~ 0. 78 ~ 1-CAT DBN ~ --------> ~ 0. 70 <br /> 220 ~ Remove all SGFA structures ~ 160. 00 ~ misc. ~ --------> ~ 160. 00 <br /> 221 ~ Replace topsoil on shaft site ~ 144. 97 ~ T/L team ~ --------> ~ 144. 97 <br /> 222 ~ Replace topsoil from Stockpile ql ~ 102. 57 ~ T/L team ~ --------> 102. 5] <br /> 223 ~ Replace [opeoil from Stockpile k3 ~ 46. 48 ~ T/L team ~ --------> 46. 48 <br /> 224 ~ Replace topsoil from Stockpile q4 6. 30 ~ T/L team ~ --------> ~ 6. 30 <br /> 225 ~ Replace topsoil from Stockpile #5 ~ 0. 38 ~ T/L Ceam ~ --------> ~ 0. 38 <br /> 226 ~ Haul substation backfill ~ 49. 91 ~ T/L team ~ --------> ~ 49. 91 <br /> 227 ~ Haul backfill for main road ~ 149. ]2 ~ T/L team ~ --------a ~ 149. ]2 <br /> 220 ~ Regrade shaft site ~ 416. 32 ~ 2-CAT DBN ~ --------> ~ 416 32 <br /> 229 ~ Regrade light use roads ~ 1B 1. 03 ~ 2-CAT DBN ~ ------ -> ~ 181. 83 <br /> 230 ~ Regrade main access road 58-92 ~ 129. 31 ~ 2-CAT DBN ~ --------a ~ 129. 33 <br /> 231 ~ Reg tade main access road ]-6B ~ 192. ]5 ~ 2-CAT OBN ~ --------a ~ 192. 95 <br /> 232 ~ Regrade substation access road ~ 100. 90 ~ 2-CAT DBN ~ --------> ~ 100. 90 <br /> 233 ~ Rip all disturbed areas ~ 8]. 01 ~ 1-CAT 12G ~ 8].01 ~ 0. 00 <br /> 239 ~ Pull up male rial Eor light use road ~ 131. 51 ~ 1-CAT 330 ~ 131.5 ~ 0. 00 <br /> 235 ~ Compact shaft backfill ~ 51. 90 ~ 1-CAT 826 ~ 51.4 ~ 0. 00 <br /> 236 ~ Compact substation backfill ~ 12. 05 ~ 1-CAT 826 ~ 12.85 ~ 0. 00 <br /> 237 ~ Compact light use road backfill ~ 29. 30 ~ 1-CAT 826 ~ 29.3 ~ 0. 00 <br /> 238 ~ Compact substation road backfill ~ 5. 40 ~ 1-CAT 826 ~ 5.9 ~ 0. 00 <br /> 239 ~ Compact main access road backfill ~ 75. 19 ~ 1-CAT 826 ~ ]5.19 ~ 0. 00 <br /> 240 ~ Equipment Mob./Demob fot SGFA 6. 34 ~ 1-CAT 826 ~ 6.34 0. 00 <br /> 250 ~ Reveget ate SGFA area 62. 00 ~ reveg. equ~ --------> ~ 62. 00 <br /> 241 ~ Seal downcomer pipes on intake/exhaust shafts ~ 8. 00 drill ~ B <br /> 242 ~ Seal SGFA intake/exha us[ shafts ~ 80. 00 ~ mist ~ BO <br /> ~ NOTE: All refuse pile zecl. work assumed to be ~ ~ ~ ~ <br /> ~ completed during structural demo. work <br /> NOTE: All seedy ng [asks assumed to take 110 hours <br />~ <br />~ <br />~ <br />~ ~ <br />~ ~ <br />~ ~ ~ <br />~ <br />~ <br />~ <br /> <br />~ <br />~ <br />~ ~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ ~ <br />~ <br />~ <br />~ <br />~ <br /> <br />~ <br />~ <br /> <br /> <br /> <br /> <br />______ ~ <br />~ <br />~ <br />~ <br />~ <br />______ <br /> <br />~ <br />~ <br />______________________________________________P_____ <br />TOTAL TASK NOURS - 3: <br /> <br /> <br /> <br />_____ <br />2,273. ~ <br />~ <br /> <br />~ <br /> <br />88 <br />~ <br />~ <br />~ <br />_______ <br />NET PROJECT <br />~ <br />~ <br />~ <br /> <br />HOURS- p.3: <br /> <br /> <br /> <br /> <br />,]]3. <br /> <br /> <br /> <br /> <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.