My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07092
DRMS
>
Back File Migration
>
Revision
>
REV07092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:01 AM
Creation date
11/21/2007 9:39:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
4/29/1997
Doc Name
WEST ELK MINE C-80-007
From
DMG
To
MIKE BOULAY
Type & Sequence
PR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />_________________________________________ <br />NET PROJECT HOURS - JOB SUPERINTENDENT COST ESTIMATSNG FORM <br />TASK NO.: 70 PREP BY SLB <br />DATE 29-Apr-9] PERMIT q: C-BO-007 <br />PERMIT ACTION Pexmxt Revision No. 7 <br />___________________________ <br />TASK DESCRIPTION Calculate net project hours <br />TASK <br />NUM1IDER <br />1 <br />2 <br />J <br />4 <br />5 <br />6 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20A <br />21 <br />22 <br />23 <br />29 <br />25 <br />26 <br />26A <br />26B <br />27 <br />28A <br />29 <br />30 <br />31 <br />32 <br />3J <br />34 <br />35 <br />36 <br />38A <br />38D <br />TASK DESCRIPTION <br />TASK FILE NAME 0007-]0 <br />Backfill portal bench to final contours I <br />Backfill/Grade Powder Maga line I <br />Backfill/Grade Suhs Cation <br />Haul coal fill from slack cubes to waste pile <br />Haul coal material from silo area to waste pile I <br />Backfill/Grade Shop and Warehouse area I <br />Backfill/Grade Office/Ba [hhouse Bldg. <br />Backfill/Grade Parking Lo C. and Temp. Office <br />BacY,frll/Grade Water Storage Tank I <br />Backfill/Grade Sylvester Gulch Fan Pad <br />Haul coal mat. from loadou[ to waste pile <br />Spread b level ungraded refuse <br />Regrade refuse pile [o final contours <br />Compact ungraded refuse pile material <br />Rip New Access Rd Erom Hwy 133 [o Sylvester G. Rtl <br />Rip Sylvester Gulch Fan Pad & Road <br />Rip Stockpile area ® Stack Tubes 6 Recla rm System <br />Rip all surface fatality areas <br />Rip New Light-llse Road 5 Access Roads I <br />Rip Bear ql Mine ~includin9 road) <br />Regrade mine access rd from new office [o ports is <br />Regrade E[ack. 'M1:be Access Road I <br />Midtlle Mine Facilit es Road <br />Regrade ramp from Hwy 133 to Loadou[ I <br />Regrade Access Rd from Sylvester G. Rd [o Neu Off <br />Push gravel from lower roads into MB-2R I <br />Push gravel from lover roads into h1B-3 <br />Finish grading entire backfilled area <br />Hackf ill Sediment Pond MB-1 I <br />Backfill Sediment Pond MB-2R <br />Backfill Sediment Pond hID-3 <br />Backfill Sediment Pond PID-4 I <br />Backfill Sediment Pond MB-6 I <br />Backfill Sewage Treatment Pond <br />Hackf ill Freshwater Pcnd FW-1 I <br />Regrade Diversion Ditch DCW-lA and 10 and D1-6 <br />Regrade all Sediment Ditches <br />Install ri prap in east sed. ditch was [e pile) I <br />Remove riprap ® Bear Mine pl <br />OPERATION West Elk Mine <br />sheet 1 of 6 <br />TASK EQUIPMENT CPM NET <br />HOURS USED CHARTING JOB HOURS <br />65. 20 1-T/L Team --------± 65 .20 <br />2. 46 1-CAT DBN --------> 2. 96 <br />2. 20 I 1-CAT DBN 2.04° I 0 .00 <br />"19. 05 1-T/L Team --------> 79 .05 <br />58 J9 I 1-7/L Teaml --------> I 58. 79 <br />16. 63 I :-CAT DBN 11.58° I O .CC <br />31. 93 1-CAT DBN 28.35" 0. 00 <br />"1"1. 05 1-CAT DBN --------> ]]. OS <br />1. 97 I 1-CAT DBN 1.52' I 0. 00 <br />5. 46 1-CAT D8N 5.06" 0. 00 <br />9. 31 1-T/L Team --------> 9. 31 <br />968. 91 1-CAT DBN --------> 468. 91 <br />226. 38 1-CAT DBN 203.67 0. 00 <br />3]6. 21 1-CATBISH 320' 0. 00 <br />0. 99 1-CAT DBN 1.18" 0. 00 <br />1. 17 1-CAT DBN 1.97" 0. 00 <br />10. 13 1-CAT DBN 12.73' 0. 00 <br />20. 26 1-CAT 08N --------> 20. 26 <br />1. 89 I 1-CAT DBN I 2.37' I G. GG <br />7. 79 1-CAT DBN 9.79' 0. 00 <br />29. 93 1-CAT 225BI --------> 29. 93 <br />19. 51 I 1-CA7 225BI 22.75" I G. Go <br />11. 93 1-CAT 225BI 17. 92~ 0. 00 <br />2. 72 ~ 1-CAT 225BI 4.2]' I 0. 00 <br />21. 21 1-CAT 225BI --------> 21. 21 <br />0. 29 1-CAT DBN -------> 0. 29 <br />4. 19 1-CAS DBN --------> 9. 1] <br />81. 81 1-CAT DBN --------> B1. B1 <br />135. 94 1-CAT DBN --------> 135. 94 <br />120. 37 1-CAT DBN ~-------> 120. 3] <br />11. HP 1-CAT D8N --------> 11. 80 <br />0. ]9 I 1-CAT 225BI --------> I 0. 79 <br />6. 11 1-CA1' DBN I --------> 6. 11 <br />0. 10 1-CAT DBN --------> I 0. 10 <br />"16. 19 I 1-CAT DBN I --------> I 76. 19 <br />19. 90 I 1-CAT 225BI --------> 14. 90 <br />1. 4] 1-CAT 225BI --------> I 1. 9] <br />231. 00 NA 231" 0. 00 <br />8. 80 NA 9.32" 0. 00 <br />TOTAL TASK HOURS - p. 1: 2,240.25 NET FROJECT HOURS- p.l: 1, 2B 9.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.