My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05969
DRMS
>
Back File Migration
>
Revision
>
REV05969
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:04:40 AM
Creation date
11/21/2007 9:30:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977573
IBM Index Class Name
Revision
Doc Date
7/9/1986
Doc Name
VALCO/PUEBLO CONCRETE DIV PUEBLO WEST PIT AMENDMENT FN M-77-573
From
VALCO
To
MLR
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />\J <br /> <br />EXHIB~E (Cont'd) <br />Therefore, if the primary plan for reclamation can be carried <br />to completion the total water surface in the four lakes will <br />be approximately 89.72 acres +. If the alternate plan in <br />Area 2 becomes necessary, the water surface in the five lakes <br />will be approximately 119.01 acres +. The operator anticipates <br />that the revegetation plan and the use of tree screens at the <br />lakes will create a desirable habitat for various species of <br />wildlife. <br />The operator intends to plant the grasses recommended by <br />the U. S. Soil Conservation Service described in the report <br />included in Exhibit I/J (see Revegetation Program in this <br />Exhibit E). It appears unlikely at this time that supplemental <br />water for sprinkling the grass during the first 6-8 weeks <br />after planting will be available, but should water become <br />available it will be used as recommended. <br />The property will be mined in nine stages, each five years <br />in duration except for the last stage which will last four years. <br />At the conclusion of each mining stage a reclamation phase will <br />be commenced. Valco plans to attempt to complete grading, <br />reshaping, seeding, mulching and fertilizing within one year <br />of the completion of each mining stage. <br />The usual planting, mulching and fertilizing time will be <br />from April 1 to hiay 15 of each revegetation year. During the <br />four remaining years of a reclamation phase the reclamation <br />progress will be monitored and remedial work will be performed <br />where necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.