My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05969
DRMS
>
Back File Migration
>
Revision
>
REV05969
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:04:40 AM
Creation date
11/21/2007 9:30:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977573
IBM Index Class Name
Revision
Doc Date
7/9/1986
Doc Name
VALCO/PUEBLO CONCRETE DIV PUEBLO WEST PIT AMENDMENT FN M-77-573
From
VALCO
To
MLR
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E?U{IIIIT "E" <br />REChADIATION PLAN & TPIETASLF. <br />Attached is a copy of the information submitted w.ttlt t-he original <br />~tPPlicatioit. Ttris amendment for mining rite D&RCtd Railroad right-of- <br />taay does not alter the integrity of the reclamation plan. The only <br />change will be the addil-ion of 5,79 acres, varying in width from 50' <br />to 100', to the Stage II excavation, and 1.G9 acres, witi.ch i.s a strip <br />7Bt in width to the Stage III excavation. 13acksloping, topsoiling and <br />revegetation plans remain the same. <br />As stated elsewhere in this application, VALCO lras been successful 1n <br />negotiations for purchase of the land between Stages III & IV as well <br />• as the purchase of in excess of. 100 contiguous acres nurtlr of the <br />Arkansas River. Upon completion of a quiet Title suit to clear rrp some <br />boundary discrepancies, a second amendment toill be filed to this plan <br />adding these acreages. Tttat will alter the originally presented <br />"Estimated Reclamation Timetable". As of this date, SL•ages 0 iY I have <br />been reclaimed. Stage II and Stage IIi, Part 1 should be reclaimed by <br />the end of 1990. The second amendment will prepare a timetable for tl~e <br />changed mining and reclamation plan encompassing rite additional acreage. <br />The 13 A lrtdustrial area is being included at the requcnst: of. staff. The <br />applicant Itas developed this as an industrial site, and it is the <br />intention that it will remain an industrial site afCer mining has depleted <br />the reserves in rite area. IJo reclamation is intended ur 1>rolrused for this <br />area. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.