Laserfiche WebLink
Tha reclamation of the outelope below the mine bench is being done according <br />to the Blua Aibbon Technical Revision Request for Mine Beach Stabilization and will <br />ba completed prior to completion of mining. This area xas filled with underground <br />development waste. The compaction of this fill ie believed to ba adequate to <br />prevent spontaneous combustion. In the event of a hoc spot prior or during re~lama- <br />tion the spot will be excavated, allow to cool and replaced. <br />The access road will be reclaimed using material cast over the aide during <br />construction to the extent possible. Further material maq be taken from the cut <br />south of the mine bench. Excavators, dozers and loaders shall be used to accomplish <br />this work. <br />Reclamation around the lover stockpile and the two scale locations will <br />be done is the initial stage of reclamation. The coal waste pad is the stockpile <br />area will be buried in the mine beach under a minimum of 4' of cover. Dozers and <br />loaders shall be used to accomplish this work. <br />The access road to the ~1 Pond will remain as is. The area between the <br />No. 1 Pond and the toe of the mine beach will require minor clean-up to be ready <br />for revegetation. <br />10g 1 (Rev. 8/30/85) <br />