Colorado Division of Minerals and Geology <br />ESTIMATING FORM - NHEEL LOADER NORK <br />Task #: 8.8 Prep. by: RCO Task filename M210-8.8 <br />Date 10/03/94 Permit #:M-77-210 Mine: Snyder Quarry <br />Permitting action Final reclamation - plant end shop area <br />Task description ; Place topsoil over shop foundation <br />XOURLY EQUIPMENT COST <br />Basic machine: CAT 966E <br />Attachment #1: ROPS Cab <br />Sheet 1 of 2 <br />Horsepower = 216 <br />Shift basis: l/day <br />(DQI 0$0) <br />Cost Breakdown - Ownership = f31.38 <br />-------------- - Operating-loader = f22.97 100 X utilization <br />- Operator = f21.58 <br />- Total cost/hr = '575.93 Total fleet cost/hr = f75.93 <br />IUTER IAL QUANTITIES <br />___________________ <br />___________________ <br />Initial Swell Final <br />volume = 67.0 LLY factor = N/A volume = 67.0 LCY <br />Quantity source/reference Amendirnt application, calculated <br />X Swell source/reference program <br />XOURLY PRODUCTION <br />Loader Cycle Time <br />NUnadjusted Basic Cycle Time (load, dump 8 maneuver) _ <br />Cyt Le Time Factors: <br />Material- Mixed material <br />Pile- Conveyor or dozer piled 10 ft. high 8 <br />Truck Ownership- No adjustment - factor rwt applicable <br />Operation- Constant operation <br />Target- Nominal target <br />Net Cycle Time Adj.= <br />Adj. Basic Cycle Time = <br />0.525 min. <br />(CHB U$A) <br />Factor (min.) <br />0.020 (CHB 16A) <br />0.000 (CNB 16A) <br />0.000 (CHB 16~) <br />•0.040 (CHB t6A) <br />0.000 (CNB 18A) <br />•0.020 min. <br />0.505 min. <br />