Laserfiche WebLink
HOURLY PRODUCTION cont'd <br />Loader Cycle Time cont'd <br />Sheet 2 of 2 <br />Rolling Resistance <br />Roadway urderfooting conditions: <br />Haul :Rutted dirt, little/no maim., 1 -2" Lire pen. <br />Return:RUtted dirt, little/no maim., 1 -2" Lire pen. <br /> Grade Rolling Total Travel <br /> Leng[h Resist. Resist. Resist. Time <br />Haul 8 return Time: (ft) (X) (X) (%) (min.) <br />Haul Route: 500 5.00 5.00 10.00 0.709 ([XB »if6) <br />Return Route: 500 -5.00 5.00 0.00 0.347 (CHB Y.'h~) <br /> Total travel time = 7.057 <br /> Total cycle time = 1.562 minutes <br />Loader Bucket Capacity <br />Rated Capacity= 4.50 LCY (heaped) <br />Bucket fill factor= 0.975 Loose mat.-moist mixed aggregetes(95 -100X) <br />Adjusted capacity= 4.39 LCY <br />Job Condition Correction Factors <br />Site attitude = 7,150 ft. <br />Altitude correction factor = 1 00 (CHB DEO) <br />Job efficiency factor = 0.83 (tsh/day) <br />Net Correction = 0.83 multiplier <br />Unadjusted Hourly Unit Produc[i on 168.58 LCY/Hr <br />Adjusted Hourly Unit Production 739.92 LCY/Hr <br />Adjusted Nourly Fleet Production 139.92 LCY/Hr <br />JOB LOST <br />Fleet size = 1 Loader(s) Total job tine = 7.99 Xours <br /> <br />Unit cast ------- <br />= 50.543 /LCY <br />Total ----------- <br />job cost = f150.87 <br />