Laserfiche WebLink
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - YHEEL LOADER YORK <br />task #: 8.7 Prep. by: RCO Task filename N210-8.7 <br />Date 10/03/94 Permit #:M-77-210 Mine: Snyder Quarry <br />Permitting action Final reclamation - plant end shop area <br />Task description Place limestone waste material over foundation <br />XOURLY EQUIPMENT COST <br />Basic machine: CAT 966E <br />Attachment #1: ROPS Oeb <br />Sheet 1 of 2 <br />Horsepower = 276 <br />Shift basis: l/day <br />(DQI 0§0) <br />Cost Breakdown - Ownership = 537.38 <br />-------------- - Operating-loader = 522.97 100 X utilization <br />- Operator = 227.58 <br />- Total cost/hr = 575.93 Total fleet cost/hr = 575.93 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume = 278.0 LCY factor = N/A volume = 278.0 LCY <br />Quantity source/reference Amerdnent application, calculated <br />X Swell source/reference program <br />HOURLY PRODUCTION <br />_________________ <br />_________________ <br />loader Cycle Time <br />Unadjusted Basic Cycle Time (load, dui 6 maneuver) = 0.525 min <br />(CHB USA) <br />Cycle Time Factors: Factor (min.) <br />Material- Mixed material 0.020 (CHB I8A) <br />Pile- Conveyor or dozer piled 10 ft. high b 0.000 (CNB 16A) <br />Truck Ownership- No adjustment factor not applicable 0.000 (CNB 16A) <br />Operation- Constant operation -0.040 (cH8 16A) <br />Target- Nominal target 0.000 (CHB IEA) <br />Net Cycle Time Adj.= -0.020 min. <br />Adj. Basic Cycle Time = 0.505 min. <br />