Laserfiche WebLink
HOURLY PRODUCTION cont'd <br />Loader Cycle Time cont'd <br />Sheet 2 of 2 <br />Rolling Resistance <br />Road~ay urxierfooting tondiLions: <br />Haul :Rutted dirt, little/no maint., 1 -2" Lire pen. <br />Return:RUtted dirt, little/no meint., 1 -2" Lire pen. <br /> Grade Rolling Total Travel <br /> Length Resist. Resist. Resist. Time <br />Haul 8 return Time: (f t) (X) (X) (X) (min.) <br />HeuL Route: 500 5.00 5.00 10.00 0.709 (CHB niAS) <br />Return Route: 500 -5.00 5.00 0.00 0.347 (CHB '4K~) <br /> __________________ Total travel time 1.057 <br /> Total cycle time = 1.562 minutes <br />Loader Bucket Capacity <br />Rated Capacity= 4.50 LCY (heaped) <br />Bucket fill factor= 0.975 Loose mat.•mois[ mixed aggregates(95 -100X) <br />Adjusted capacity= 4.39 LCT <br />Job Condition Correction Factors <br />Site altitude = 7,150 ft. <br />Altitude correction factor = 1.00 (CXB D8b) <br />Job efficiency factor = 0.83 (1sh/day) <br />Net Correction = 0.83 multiplier <br />Unedj usted Nourly Unit Production 168.58 LCY/Hr <br />Adjusted Nourly Unit Production 139.92 LCY/Hr <br />Adjusted Xourly Fleet Production 139.92 LCY/Nr <br />JOB LOST <br />Flee[ size = 1 Loader(s) Total job time = 0.48 Nours <br /> <br />Unit cost _______ <br />= f0.543 /LCY <br />Total ___________ <br />job cost = f36.36 <br />