My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-11-02_REVISION - M1987028
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987028
>
2004-11-02_REVISION - M1987028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:38 AM
Creation date
11/21/2007 9:22:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987028
IBM Index Class Name
Revision
Doc Date
11/2/2004
Doc Name
FW Increase
From
DMG
To
Colorado Marble LLC
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatin4 Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 11/01/2004 <br />User: ESC <br />State :Colorado PermiUjob# : M-1987-028 <br />County :Chaffee Abbreviation :none <br />Site : L11y Mines <br />Agency or organization name :DMG <br />Permit or other job action :Surety Increase <br />Task description :Grade Mid Bench to achieve 3h:1 v Slopes <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU Horsepower : 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : f-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $69- NA <br />Operating cosVhour : $124.53 100 <br />Ripper op.cosVhour : $0.00 0 <br />Operator cosUhour : $3f.76 NA <br />Totaf unit cost/hour : $225.99 Total fleet cost/hour : $451.99 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 26,160 LCY factor : NA volume : 26,160 LCY <br />Source of estimated volume :DMG Estimate <br />Source of estimated swell factor :NA <br />,< <br />>: ;:: . <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Operator skill ; 0.75 I (avg.) <br />Average push distance : 200 feet <br />Unadjusted hourly production : 946.0 LCY/hr <br />Material consistency description <br />frll or embankment <br />Average push gradient : 10.00 <br />Average site altitude : 11,000 feet <br />Material weight : 3,300 IbslLCY <br />Weight description <br />decomposed rock - 75% Rock. 25% Earth <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) <br />Unit cost : $0.637 /LCY <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : L22 <br />Altitude : 0.98 <br />Matedal weight : 0.70 <br />Blade type : 1.00 <br />Net correction : 0.38 <br />Adjusted unit production : 354.76 LCYlhr <br />P.djusted fleet production : 709.53 LCY/hr <br />Total job time : 36.87 Hours <br />Total job cost : $16,665 <br />Filename : M028-003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.