Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 11/01/2004 <br />User: ESC <br />State :Colorado <br />County :Chaffee <br />Site :Lily Mines <br />Permiujob# : M-1987-028 <br />Abbreviation :none <br />Filename : M028-002 <br />Agency or organization name : DMG <br />Permit or other job action :Surety Increase <br />Task description :Push Waste Material to Toe of North <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat DiOR - 10SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :lshank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $69.70 NA <br /> Operating cosUhour: $124.53 100 <br /> Ripper op.cosUhour: $0.00 0 <br /> Operator oosUhour: $31.76 NA <br /> Total unit cosVhour : $225.99 Total fleet cost/hour : $451.99 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 16,100 LCY factor : NA volume : 18,100 LCY <br /> <br />Source of estimated volume : DMG Estimate <br />Source of estimated swell factor :NA <br />.. ... .. <br /> <br />HOURLY PRODUCTION ._ ~ <br /> <br />Job Condition . :3 .. ~:::: <br /> <br />Correction Factors ..,. <br />.. <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production ; 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Matedal consistency description : Job efficiency : 0.83 (1 shiff/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 0.67 (Cat NB) <br />Average push gradient : 15.00 % (pos) Altitude : 0.98 (Cat NB) <br />Average site altitude : 11,000 feet Material weight : 0.70 (Cat NB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,300 Ibs/LCY Net correction : 0.20 <br />Weight descdption <br />Decomposedrock - 75% Rock, 25% Earth <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) <br />Unit cost : $0.891 iLCY <br />Adjusted unit production <br />Adjusted fleet production <br />Slope <br />Horsepower: 570 <br />Total job time <br />Total job cost <br />253.63 LCY/hr <br />507.25 LCY/hr <br />31.74 Hours <br />