Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # ; 004 <br />Date : 11/01/2004 <br />User: ESC <br />State :Colorado PermiUjob# : M-1987-028 <br />County :Chaffee Abbreviation :none <br />Site :Lily Mines Filename :M028-004 <br />Agency or organization name :DMG <br />Permit or other job action :Surety Increase <br />task description :Move Mine Waste into South Pif <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D10R - 10SU <br />Blade type : Seml-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :1-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization °k <br />Cost Breakdown : Ownership cost/hour : $69.70 NA <br /> Operating cosUhour: $124.53 100 <br /> Ripper op.cosUhour: $0.00 0 <br /> Operator cosUhour : $31.76 NA <br /> Total unit cosNhour : $225.99 Total fleet cosUhour : $451.99 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 9,333 LCY factor : NA volume : 9,333 LCY <br />Source of estimated volume :DMG Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 250 feet <br />Unadjusted hourly production : 754.3 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 10.00 % (~ <br />Average site altitude : 11,000 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient: 1.22 <br />Altitude : 0.98 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.43 <br />Adjusted unit production <br />Adjusted Fleet production <br />Horsepower: 570 <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) Total job time <br />Unit cost : $0.702 /LCY Total job cost <br />321,89 LCY/hr <br />643.78 LCY/hr <br />14.50 Hours <br />