My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-07-30_REVISION - M1973007SG
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973007
>
1992-07-30_REVISION - M1973007SG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 7:38:24 PM
Creation date
11/21/2007 9:22:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973007SG
IBM Index Class Name
Revision
Doc Date
7/30/1992
Doc Name
APPLICATION FOR SUCCESSION OF OPERATOR AND AMENDMENT
From
Transit Mix Concrete Company
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1985 PERMIT AMENDMENT PROVISIONS - SUMMARY <br />• The following is a summary of the provisions of the 1985 permit <br />amendment and a review of the alterations this amendment caused in <br />the original permit provisions. <br />A. Amendment summary <br />1. Map HS3 shows the area <br />2. PURPOSES: <br />• <br />C~ <br />included in the amended permit. <br />a)To increase the amount of land included in the <br />permit. <br />b)To revise and update the mining and reclamation <br />plans. <br />c) To coordinate the reclamation of the western <br />portions of this operation with the Castle Concrete Sand <br />Pit located immediately to the north. <br />3. LAND INCREASE: <br />a)A small parcel of land located west of <br />Academy Boulevard was added to the permit. <br />b)The main increase in land area occurred on the <br />east side of Academy Boulevard. <br />c)The permit area was increased from 159.4 acres to <br />325.6 acres. <br />4. MINING PLAN REVISION: <br />a)Complete rephasing of the operational layout <br />and sequence of operation. <br />b)Inclusion of TR#I into permit. <br />1) All provisions of TR#1 still apply. <br />c)Alteration to allow deposition of wash fines <br />as backfill in the Castle Concrete Sand Pit <br />5. RECLAMATION PLAN REVISION: <br />a)More precise definition of final topography on <br />west side of Academy Boulevard. <br />b)Elimination of backfill on North and East slopes <br />of Area 1 (see coordination with Castle Concrete <br />Sand Pit). <br />c)Change in revegetation program. <br />1) Elimination of mulching. <br />2) More reliance on developmental processes <br />in vegetation. <br />History <br />Page HISf <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.