Laserfiche WebLink
• <br />• <br /> <br />4) The timetable for reclamation was that this area would <br />be completed in about 10 years. <br />d)The mining timetable for this area indicated that this <br />land would remain disturbed until all the mining was <br />completed. <br />5. Area 2 (18 acres) was located east of Academy Boulevard. <br />a)Referred to as the Present Mining Area. <br />b)It was expected that this would be completed with mining <br />in 6 to 8 years. <br />6. Area 3 (7.9 acres) was located east of Academy Boulevard. <br />a)Referred to as Near Future Mining Area. <br />b)It was expected mining would start in this area in 5 <br />years. <br />c)Mining was anticipated to be completed in 12 to 14 years. <br />7. Area 4 (59.4 acres) was located east of Academy Boulevard. <br />a)Referred to as Distant Future Mining Area. <br />b)It was expected that mining would start in 12 to 14 years. <br />c)Mining was anticipated to be completed in 40 to 60 years. <br />8. Reclamation provisions in the original permit. <br />a)LAND USE PROPOSED: Native Range. <br />--.~'~b)SLOPE-PRODUCTION METHOD: Backfilling. <br />~"~~ c)Area 1 -see comments on reclamation under Area 1 <br />- description above. <br />d)Area 2 reclamation. <br />1) Produce the slopes when mined out. <br />2) Topsoil and revegetate. <br />e)Area 3 reclamation. <br />1) Similar to Area 2. <br />f)Area 4 reclamation. <br />1) Reclamation would start in about 30 years. <br />2) Methods would be similar to Areas 2 and 3. <br />3) Completion of reclamation in 3 years after the end of <br />mining. <br />g)SOIL: Replace topsoil to a depth of 2 inches to 6inches <br />on pit slopes and in pit bottom. <br />h)RE4EGETATION: <br />1) Seed in March or after November. <br />2) Drill seeding anticipated. <br />3) Mulch applied at rate of 4000 pounds per acre straw <br />crimped. <br />History <br />Page HIS-4 <br /> <br />