Laserfiche WebLink
CIRCES Cost Estimatinu Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />N0. I TASK DESCRIPTION <br />FORM FLEET TASK DIRECT <br />USED SIZE HOURS COST <br />901 -sread 80,000 cu.yd. stored coal waste material on active pile dozer 2 99.9 $43,225 <br />902 -Compact 80,000 cu.yd. coal waste material on area 2.5 compact 2 11.8 $2,989 <br />903 -Compact 300,000 cu.yd. truck dumped coal waste on active pile compact 2 44.3 $11,208 <br />includes innation factor adjusMent of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />NA <br />SUBTOTALS: 1$6.1 <br />TOTAL DIRECT COST' <br />$1,160 <br />$603 <br />NA <br />$5, 742 <br />Liability insurance : 2.02 % of direct total = <br />Performance bond : 1.05 % of direct total = <br />Job superintendent : NA' NA NA total = <br />Profit : 10.00 % of direct total = <br />•not required (or eqp. operator serves as super) TOTAL O 8 P = $7,505 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+08P)= $64,927 <br />Financial warranty processing (legal/related costs) : NA NA NA total = $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : NA NA NA total = NA <br />CONTINGENCY- NA' NA SOtal = NA <br />'contingencies accounted /or at task/eve/ TOTALINDIRECT COST= $7,505 <br />TOTAL BOND AMOUNT (direct + indirect) = 564,927 <br />