My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV04770
DRMS
>
Back File Migration
>
Revision
>
REV04770
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:03:00 AM
Creation date
11/21/2007 9:20:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
10/5/2005
Doc Name
Adequacy Responses
From
Janet Binns
To
Byron Walker
Type & Sequence
TR49
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatintt Software <br />PROJECT IDENTIFICATION <br />Task # : 901 <br />Date : 10/05!2005 <br />User : JHB <br />State :Colorado <br />County : Routt <br />Site : Foidel Creek Mine <br />PermiUjob# : C1982-056 <br />Abbreviation :none <br />Filename : C56 -901 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action : TR49 <br />Task description :Spfead 80,000 cu. yds. tem <br />HOURLY EQUIPMENT COST <br />stored waste material <br />Basic machine : Cat D10R - 10SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :NA <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $60.00 NA <br />Operating cosUhour : $124.54 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cosUhour : $31.78 NA <br />Total unit cosUhour : $216.32 Total fleet cosUhour : $432.85 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 80,000 LCY factor : NA volume: 80,000 LCY <br />Source of estimated volume :permit page 2.05-97.1 (rev. 9/22/05) <br />Source of estimated swell factor : NA <br />,: <br />,. <br />HOURLY PRODUCTION :: , <br /> <br />Job Condition Correction Factors <br /> <br />Source <br />Average push distance : 400 feet <br />Unadjusted hourly production : 497.3 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 1.00 % (i <br />Average site altitude : 7,000 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Coal -Bituminous, Raw <br />Operator skill : 0.75 <br />Materia! consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.02 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 0.81 <br />Adjusted unit production : 400.37 LCY/hr <br />Adjusted fleet production : 800.73 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) Total job time : 99.90 Hours <br />Unit cost : $0.540 /LCY Total job cost : $43,225 <br />Horsepower: 570 <br />
The URL can be used to link to this page
Your browser does not support the video tag.