My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-27_REVISION - M1997065
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997065
>
2007-09-27_REVISION - M1997065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:05:56 PM
Creation date
11/21/2007 9:20:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997065
IBM Index Class Name
Revision
Doc Date
9/27/2007
Doc Name
Conversion approval
From
DRMS
To
Stone Wholesale Corporation
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Coat Eatlmatlna Software <br /> BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 003 State :Colorado Permitfjob# : M-1997-065 <br />Date : 09/2612007 County :Larimer Abbreviation :none <br />User : ESC Site :Brownstone Quarry Filename : MO85-003 <br />agency or organization name : DRMS <br />Permit or otherjob action : CN-01 <br />Task description : Repla <br />HOURLY EQUIPMENT COST <br />from Lower Plles <br />Basic machine :Cat D8R Series ll - 8SU (200: <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :NA <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership costlhour : $50.32 NA <br />Operating cosUhour : $77.13 100 <br />Ripper op. cosVhour : $0.00 NA <br />Operator cosUhour : $32.78 NA <br />Total unit costlhour : $160.22 Total fleet cosUhour : 5320.44 <br /> <br />MATERIAL UANTITIES <br />Initial Swell Loose <br />volume: 32,000 LCY factor : NA volume: 32,000 LCY <br /> <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition C orrection Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 491.9 LCY/hr <br />Material consistency descdption <br />Consolidated stockpile <br />Average push gradient : 10.00 % (r <br />Average site altitude : 5,400 feet <br />Material weight : 2,650 Ibs/LCY <br />Welght descdption <br />- 25% Rock. 75% Earth <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) <br />Unit cost : $0.615 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.22 <br />Altitude : 1.00 <br />Matedal weight : 0.87 <br />Blade type : 1.00 <br />Nat correction : 0.53 <br />Adjusted unit production : 260.45 <br />Adjusted fleet production : 520.90 <br />Total job time : 61.43 <br />Total job cost : 519,885 <br />LCYIhr <br />LCY/hr <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.