My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-27_REVISION - M1997065
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997065
>
2007-09-27_REVISION - M1997065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:05:56 PM
Creation date
11/21/2007 9:20:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997065
IBM Index Class Name
Revision
Doc Date
9/27/2007
Doc Name
Conversion approval
From
DRMS
To
Stone Wholesale Corporation
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Coat Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 004 <br />Date : 09/282007 <br />User : ESC <br />State :Colorado <br />Penniffjob # : M-1997-085 <br />County :Larimer Abbreviation :none <br />Site :Brownstone Quarry Filename :M065-004 <br />agency or organization name :DRMS <br />Permit or otherjob action :CN-01 <br />Task description : Rlp SI <br />HOURLY EQUIPMENT COST <br />Area <br />Basic machine :Cat D8R Series 11 - 8SU (200: <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cosf/hour : $57.41 NA <br />Dozer operatingcost/hour: $43.87 100 <br />Ripper operatingcosUhour: $5.01 75 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $139.07 Total fleet cosUhour : $139.07 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Altemate methods - <br />Seismtc : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 2.00 acres Rip depth (ft) : 3.00 Volume : 9,680 BCY or CCY <br />Source of estimated quantity :DRMS Estimate <br />Source of estimated load factor : NA <br /><:: ,.: > <br />HOURLY PRODUCTION <br />Altemate methods - <br />Selamic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />NA feet/second <br />NA cu. yds./hour <br />2.56 feeUpass <br />708 feeUpass <br />50.00 feeUpass <br />88.00 feef/minute <br />0.25 minutes/pass <br />0.596 acres/hour <br />Unadjusted production : 2,461.39 cu. yds./hour <br />JOB TIME AND COST <br />Unadjusted production <br />per selected method : 2,461.39 cu. yds./hour <br />Site altitude : 5,400 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shiff/day) <br />Net job conection : 0.83 multiplier <br /> <br />Adjusted unit production : 2,042.96 cu. yds./hour <br />Adjusted Fleet production : 2,042.98 cu. yds./hour <br />Fleet size : 1 dozers) Total job time : 4.74 hours <br />Unit cost : $0.068 par cu. yd. Total jab cost : $859 <br />
The URL can be used to link to this page
Your browser does not support the video tag.