Laserfiche WebLink
Truck/Loader Team Work cont'd Task # : Oo2 sheet 2 of 2 <br />..;: ,. .. <br />Loadlna Tool flrcle Tims : ~ Number of loadin tool ~~ ~ ~ ~ ~~ <br />g passes required to fill Wck : 5 passes <br />6tpvatore and front shovels -machine cyde time vs. Jab conditlon retlng : NA <br />-selected value vriNln basic retlng : NA <br />Track loaders -material descr.: NA <br />- cyde time elemanb (min.) : Load <br />NA Maneuver: NA Dump: 0.100 <br />Wheel and track loaders - unadjusted basic loader cyde time (load, maneuver, and dum{ 0.550 minutes <br />Cyde Time Patios Loading Conditlon Des«iptltxt Factor (min.) Source <br />Matedal : Matedal 8' and over diameter 0.030 (Cat HB) <br />Stadcpile : Conveyor or dozer piled 10 R. high and up 0.000 (Cat HBJ <br />Truck ownership : Common ownership o/trucks and loaders -0.040 (Cat HB) <br />Operatlon : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cyde 8me adjustment : -0.050 minutes <br /> Adjusted loader cyde tlme (total tlme per loader pass) : 0.500 minutes <br /> Net load tlme per Wck' : 2.100 minutes <br />Truck CvGe Time : • ewk a 1st loee« cyae carpded aunrp wa eanarpe n set. loae« cyae nme <asMenpe nme <br />Truck exchange tlme ": 0.50 minutes........ Adjusted for site altitude : 0.500 minutes <br />Truck load tlme: 2.100 minutes........ Adjusted for site altlNtle : 2100 minutes <br />Truck maneuver and dump tlme: 0.90 minutes........ Adjusted for site al8tude : 0.900 minutes <br />"set a10 N exdange nrre <atll. loae« cycle nme (wck escnanpe canpleled dump 1st laetl« ryde) <br />Truck travel (haul 8 return) tlme: Road conditlon :Hard, smooth, stabilized, suAeced, watered, maintained <br />Haul route <br />Road <br />segment r Haul distance <br />(/eet) Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />(feet/minute) Travel time' <br />(minutes) <br />1 400 -20.00 2.00 -18.00 960 0.579 <br />2 500 5.00 2.00 700 1588 0.342 <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : Haul tlme " : 0.921 I <br />1 500 -5.00 200 -3.00 2938 0.228 <br />2 400 20.00 2.00 22.00 781 0.989 <br /> <br /> <br /> <br /> <br /> <br /> <br />ninutes <br />• trawM dma slwwn ror eecn selaront mdwee aocelennon/decelennm adlusansa Relum time": 1.217 minutes <br />-'total heW and r«um Ilme shown inductee aletude Wjuetment Total trod( cYc~ 8me : 5.838 minutes <br />Loading tool unit production : 378.81 LCY/hour...... Adjusted for )ob effidency : 314.24 LCY/hour <br />Truck unit production : 174.58 LCY/hour...... Adjusted for jab effidency : 144.91 LCYRtour <br />OpBmal no. Wcks/ioading tod : 2 trucks........... Selected no. Wcks/loader : 2 trucks <br /> Adjusted houry Wck team productlon : 289.81 LCY/hr <br /> Adjusted houny single wcklloader team productlon : 289.81 LCY/hr <br /> Adjusted howdy multlple Wddloader team produc8on : 579.62 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Team(s) Total job 8me : 331.00 Hours <br />Unit coat : (1.081 /LCY Total job cost : (207,488 <br /> <br />