My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV04612
DRMS
>
Back File Migration
>
Revision
>
REV04612
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:02:47 AM
Creation date
11/21/2007 9:18:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
2/15/2001
Doc Name
ROADSIDE PORTALS PN C-1981-041 TR 35 MIDTERM REVIEW RESPONSES
From
DMG
To
POWDERHORN COAL CO
Type & Sequence
TR35
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ponding behind the seals, Please amend the reclamation plan to incorporate placement of pipes <br />to drain water collected behind the seals, and provide appropriately amended plans. <br />5. South Portal Drainage Plan issues. <br />a) Updated material balance calculations were provided on amended Exhibit 6C. Table 1J-1 <br />should be updated to correspond to the amended exhibit. <br />b) Appropriate cross-sections were provided. Comparison of amended maps and cross-sections <br />with photos and maps of the existing topography indicate that the proposed topography would <br />comply with backfilling and highwall elimination requirements of the regulations. Item <br />resolved. <br />c) Appropriate response and modified text was provided. Item resolved. <br />d) Appropriate response and modified designs were provided. Item resolved. <br />e) Appropriate response and amended text was provided. Item resolved. <br />6. Additional information and commitments regarding soil borrow area volumes, soil quality, and <br />topsoil salvage and replacement was provided as requested. It is not clear how the square foo_ tage <br />represented by each of the soil samples listed on new Table ld-7 was determined. Please <br />explain the basis for the projections, and provide the appropriate documentation. <br />7. The text was appropriately amended. Item resolved. <br />8. Appropriately amended Tab 20 text was provided as requested. Item resolved. <br />9. New Adequacy Items. In closely reviewing [he approved reclamation plan in association with <br />review of TR-35, we have identified the following issues of concern, which we request that you <br />address in the context of TR-35. <br />a) Steep slope seedbed preparation/soil roughening. No firm commitment is included in the <br />permit for scarification of the steep slope areas to be broadcast seeded, although on page 14-16 it <br />is stated that "...dozer tracking up and down steep slopes may be used before seeding to <br />establish a better seedbed." Based on results of previous seeding efforts on the CRDA refuse <br />piles where dozer tracking was employed, this technique would appear to be sufficient on north <br />and east facing slopes. However, on predom inaptly south and west facing slopes such as <br />CRDA 2 and portions of the RSRDA; larger scale, longer lasting roughening techniques would <br />be waranted, to provide for increased moisture retention and more favorable microsites for plant <br />establishment. An extensive gouging treatment accomplished by track hoe, as implemented <br />previously on the South Fan and 2-West Portal slopes, or similar gouging treatment applied with <br />a dozer blade, would be appropriate for the steep, unfavorable slope exposures. Please amend <br />appropriate section(s) of the reclamation plan to address specific seedbed preparation/soil <br />roughening techniques that will be applied to slopes prior to broadcast seeding. <br />b) Coal Creek Channel Permanent Diversion. An amended design for the permanent channel <br />diversion segment was approved by TR-32, which specifies removal of existing rock check <br />structures, salvage of channel sediment for use as non-toxic refuse cover, installation of riprap in <br />specified locations, and installation of concrete wingwalls a[ the upper road crossing. A <br />
The URL can be used to link to this page
Your browser does not support the video tag.