Laserfiche WebLink
... .... <br />f j <br />RECLAMATION COST SUMMARY con['d <br />H. EARTHNORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description <br />N/A <br />i <br />sheet 3 of 4 <br />Cost (E) <br />Subtotal (N ): <br />1. EARTHNORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (S) <br />________I__________________________________.._______________I____________ <br />N/A <br /> Subtotal (I ): <br />J. EAR THNORK - 70PSOIL/SUBSOIL REPLACEMENT <br />Task No.l <br />________ <br />_________ Task Description <br />______..~____________________________ ~ <br />____I_ Cost (E) <br />___________ <br />i <br />I <br />11 ~ Replace b" of topsoil over Stockpile/Processi ng ~ E3,497 <br /> Area w/ avg. 300' haul. <br />12 I Replace 6" of topsoil over North Central Unit w/ ~ 5204 <br /> avg. 300' haul, <br />13 ~ Replace 6" of topsoil over Northwest Unit w/ avg. E2, 043 <br /> 500' haul. <br />Subtotal (J): E5, 744 <br />