Laserfiche WebLink
:. •~i:,... ..,. ~ ... <br />f ~ , ._.. ... . ___.._~._-__ .. <br />• • <br />RECLAMATION COST SUMMARY cont'd sheet 2 of 4 <br />D. EARTHWORK - FILL COMPACTION <br />Task No.l Task Description I Cost (E) <br />________ I __________________________________________________ I ____________ <br />I Included in other tasks. I <br />Subtotal (D ): <br />E. EARTHWORK - RIPPING <br />Task No.l <br />---- Task Description <br />-' <br />- <br />------'---°-------- -------- I <br />---------- I - Cost (E) <br />-'-------- <br />----'--- I <br />4 I - <br />Rip --' <br />- <br />floor of Stockpile/Processing Area 1.5' deep.l E2, 015 <br />I <br />5 I <br />Rip <br />floor of North Central Unit pit to I <br />1.5' deep.l <br />I <br />E107 <br />I <br />6 I Rip floor of Northwest Unit pit to 1.5' deep. I 51,491 <br />I I <br />________________________________________________________________________ <br />Subtotal (E ): 53,612 <br />F. EARTHWORK - ROAD RECLAMATION <br />Task No.l Task Description I Cost (E) <br />'------- I ----"-"-'-----"-'-----"---""----"--"'----- I "'---------- <br />I H~A I <br />I I <br />I I <br />------------------------------------------------------------------------ <br />Subtotal (F) <br />G. EARTHWORK - FINISH GRADING <br />Task No.l Task Description I Cost (E) <br />_______ I __________________________________________________ I ____________ <br />10 I Reconstruct secondary access road through the I 5287 <br />I Stockpile/Processing Area. Assume a 20' wide x I <br />1900' long road constructed by moving an average I <br />I of two feet deep material. I <br />Subtotal (G): E287 <br />