My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03916
DRMS
>
Back File Migration
>
Revision
>
REV03916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:52 AM
Creation date
11/21/2007 9:13:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994011
IBM Index Class Name
Revision
Doc Date
12/17/1997
Doc Name
WEST END PIT PN M-94-011 CONVERSTION 1 CN-01 PRELIMINARY RECLAMATION COST ESTIMATE
From
DMG
To
DOUG CONGER
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T _ <br />RECLAMATION COST SUMMARY cont'd <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description <br />N/A <br />sheet 4 of 4 <br />~ Cost (5) <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING YELL SEALING <br />Task No.~ Task Description <br />N/A <br />Lost (5) <br />Subtotal (L ): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (E) <br />14 ~ Demolf tionD ispose of 5'x5'x10' mass iJ 50.23/c.f. ~ 558 <br />15 ~ Seeding As per attached worksheets. ~ 519,875 <br />16 ~ Fencing 2050' four strand barbed wire fence ~ E8, 200 <br />17 ~ Mob/Demob As per attached worksheet ~ 5963 <br />Subt otaL (M): 529,096 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 549,453 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD & PROFIT <br />Item No.~ Item Description <br />Cost (E) <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ 5767 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ 5482 <br />3. ~ Contractor's Profft.........., 70.00% of dir. + E4, 945 <br />4. ~ Job Superintendent..Equip, oper. serves as super. <br />Subtotal (A): Eb, 194 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 555,647 <br />B. DMG PROJECT ADMINISTRATION E%PEN SES <br />Item No.~ Item Description ~ Cast (E) <br />________I__________________________________________________I____________ <br />1. ~ Minerals Program Adm S.OOX of cntr.l E2, 782 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B ): E2, 782 <br />TOTAL INDIRECT RECLANATION COSTS (subtotals A through B): 58,976 <br /> <br />TOTAL PERFORMANCE <br />BOND AMOUNT __ <br />(direct plus indirect costs): __________ <br />558,430 <br />
The URL can be used to link to this page
Your browser does not support the video tag.