Laserfiche WebLink
(i) The various stages or phases of the operation will be dictated by market <br />demand. Reclamation will be completed within 5 years after mining is completed <br />(ii) It is estimated that the size of the excavated area will be between 15 and 20 <br />acres at any given time, and that approximately 5-10 acres will be devoted to product <br />stockpile, topsoil stockpile, and all the related processing equipment, which may <br />include portable crushing and screening plant, hot mix plant, and concrete plants. <br />(iii) Sequencing the events of the mining operation are as the market demands, <br />and it is not feasible to predict with any accuracy at this time, however, it is estimated <br />that this pit contains approximately 10 years reserves. <br />(f) The Mining Plan Map, along with the Vegetation and Soils Map will show in more <br />detail the topography and the gravel deposits. This is an alluvial gravel deposit of <br />unknown depth with a shallow topsoil layer. No overburden will be removed to mine <br />the deposit. <br />(g) Sand and gravel are the main commodities to be mined and there are no other <br />commodities to be mined. <br />(h) All products for this mine site will be used for construction materials as defined by <br />the DMG, as follows: "Construction Materials" means rock, clay, silt, sand, gravel, <br />limestone, dimension stone, marble or shale extracted for use in the production of <br />non-metallic construction products. <br />