PIlase IVb Weekly Summary No. 25 Page 2 <br />003-2203 <br />for geomembrane deployment. Ames excavated approximately 550 lineaz feet of anchor trench on the <br />upper bench of the 2H:I V riser slope. Ames also backfilled approximately 4001ineaz feet of Phase Nb <br />OSA anchor trench on the Phase III ore slope 9636 elevation bench. <br />Ames hauled, placed, and compacted SLF material into the Low Volume Solution Collection System <br />(LVSCS) riser slope, northeast of the PSSA in the Phase IVb OSA. SLF material was worked, tested, <br />and passed per project specification prior to SLF surface acceptance. <br />Ames continued placement of High Volume Solution Collection System (HVSCS) secondary and <br />tertiary piping within the Phase IVb OSA limits, followed by DCF haul and placement per project <br />plans. Ames continued placement of DCF onto the north slope of the Phase IVb OSA, west of the <br />LOB. Ames continued haul and placement of DCF in the Phase Nb OSA adjacent to the Phase Na tie- <br />in. Ames also began to haul and place DCF onto the Phase Nb /Phase III ore slope, south west of the <br />PSSA sump. <br />Ames continued production of DCF at the screen plant located neaz the Secondary Crusher. Ames also <br />continued limited production of SLF. <br />Poly-Flex continued deployment of 80-mil double-sided textured LLDPE geomembrane in the Phase <br />Nb OSA on the 2H:1V LVSCS riser slope. Poly-Flex deployed 80-mil double-sided textured LLDPE <br />geomembrane over an azea of approximately 76,134 squaze feet in the Phase Nb OSA during this <br />reporting period. Geomembrane panels B-366 through B-400 were deployed, seamed, and tested by <br />Poly-Flex. Destructive fusion and extrusion seam samples DFb-113 through DFb-121 were mazked for <br />future removal and testing. <br />Poly-Flex resumed deployment of 100-mil smooth LLDPE geomembrane on the Phase Nb OSA south <br />ore slope. Poly-Flex deployed 100-mil smooth LLDPE geomembrane over an area of approximately <br />100,175 square feet in the Phase Nb OSA during this reporting period. Geomembrane panels B-309 <br />through B-365 were deployed, seamed, and tested by Poly-Flex. Destructive fusion and extrusion seam <br />samples DFb-102 through DFb-112 and DXb-22 through DXb-24 were mazked and removed. <br />Destructive fusion and extrusion seam peel and sheaz tests on 100-mil smooth geomembrane deployed <br />during this reporting period passed project specification. <br />A map of the area worked during this reporting period is provided in Attachment C. <br />Phase Nc <br />Ames performed no construction activities in the Phase Nc azea during this reporting period. <br />Field Monitoring and Testing Activities <br />Golder observed construction activities associated with Phase N earthworks. All construction materials <br />and soil materials placed were verified as suitable, and construction methods were in accordance with <br />project specifications. <br />rw~sw zsmissmiriz. zoos Golder AssoCidteS lnC. <br />