Laserfiche WebLink
- Exhibit F -Reclamation Plan Map: <br />2 <br />~-8~-a~ <br />unaffected lands that will not be excavated, and to establish st ble quarry <br />faces. Safety of men and equipment will receive first priority, nd remains <br />dependent upon the capacities of the same. <br />In general, final topography for each phase will result in 3h: <br />irregularly shaped quarry floors, with stable yet staggered ~ <br />with micro-benches of a minimum of three feet in depth for e~ <br />feet of quany wall height, to the maximum depth of the depot <br />feet]. Irregular and rough surfaces will be encourage in orde <br />geometric effects and enhance recoiling and general stability <br />All benches will be soiled and revegetatioh attempted. Quan <br />slopes may or may not be soiled or revegetated if they ex <br />Regardless, the stability of final walls will be determined in <br />with the DMG upon completion of extraction activities. Adjustr <br />final pit wall will tie made jointly to the extent necessary to b~ <br />stability of the final wall prior to release. <br />Where reclamation and revegetation is attempted on pre-Is <br />lands [PLj and pre-law marginally affected lands [ML], the regl, <br />Rule 3.1.10(1) will be waived, per Rule 3.1.10(8)(e). Where r <br />is successful on pre-law affected lands and pre-law margin <br />lands it shall provide credit to the operation under Rule 3 <br />substitute lands for those areas where revegetation efforts fail <br />lands [AL] to an equivalent extent as, where such lands have <br />minimum of two seeding/planting attempts over a five year pe <br />phase upon completion of mining] during the life of the operatic <br />All PL, ML, and AL land designations are shown on Exhibit C- <br />Mining Plan Map. Reclamation will not occur on Pre-Exit <br />Roads [RR], also shown on Exhibit C-Part 2 -Pre-Mining Plan <br />Reclamation phasing and final topography is not shown <br />dependent upon the rate and duration of extraction activities, <br />adjusted in the Annual Report. Since all lands undergoing <br />are based on a per acre cost, all lands undergoing such rec <br />be covered by a Financial Warranty based upon determinal <br />by the DMG in consultation with the operator, and reviewed <br />the time of the required DMG Annual Report. Financial Wai <br />based upon the total area of affected land reported on the fc <br />projected into the year ahead, and adjusted in the Annual F <br />v or flatter <br />uarry walls <br />:ry ten [10J <br />it (75-1001 <br />to reduce <br />of the site. <br />walls and <br />eed 2h:1 v. <br />to the <br />assure <br />~. <br />w affected ~~~° <br />rements of <br />vegetation a~ ~- <br />ly affected j ~ <br />1.10(9) as ~',~ s ~,J'`°~ <br />in affected ~" <br />received a ~ <br />iod [typical <br />n. <br />2 - Pre- <br />Access <br />since it is <br />ind may be <br />reclamation <br />amation will <br />ms derived <br />annually, at <br />ante will be <br />owing year, <br />:port of the <br />Colorado Division of Minerals and Geology [DMGI Regular Impact <br />M->3~210 -Rocky Road Quarry -Rocky Road Investment <br />