My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-01-29_REVISION - M1984043 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984043
>
2007-01-29_REVISION - M1984043 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:05:55 PM
Creation date
11/21/2007 9:02:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984043
IBM Index Class Name
Revision
Doc Date
1/29/2007
Doc Name
Conversion Approval
From
DRMS
To
Pelino, Inc.
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Esttmatina Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 01/262007 <br />User: ESC <br />Agency or organization name :DRMS <br />Pemtit or other job action : CN-01 <br />Task description :Rip Phase N <br />HOURLY EQUIPMENT COST <br />State :Colorado <br />County : Chaffee <br />Site :Jesse Lee <br />PenniUjob # :IM-1984043 <br />Abbreviation :none <br />Filename :M043-002 <br />Basic machine :Cat D8R Sedes ll - 8SU (200; Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : f per day <br />Attachment no. 2 :3shank dpper <br /> (CRG) <br />Data source : <br /> _ <br />Utilization % <br />Cost Breakdown : Ownership costlhour : $58.24 NA <br />Dozer operating costlhour : $73.75 100 <br />Ripper operating costlhour : $5.14 75 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $169.91 Total fleet cosUhour : rK339.83 <br />Selected estimating method : Area <br />Altemate methods - <br />Seismtc : NA NA Load factor : NA Bank volume : NA BCY <br />Ares : 8.50 acres Rip depth (ft) : 3.00 Volume : 41,140 BCY or CCY <br /> <br />Source of estimated quantity :DRMS EsBmate <br />Source of estimated load fadar : NA <br /> <br />HOURLY PRODUCTION .:., ,:.. <br />Altemate methods - ob Condition Correction Factors - <br />Seismic : Seismic velocity : NA feeUsecond Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2,905.25 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.56 feef/pass Site altitude : 8,000 feet <br />Average dpping width : 7.08 feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 100.00 feet/pass Job efficiency factor : 0.83 (1 shiR/day) <br />Average dozer speed : 88.00 feeUminute Net job conection : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per un(t area : 0.703 acres/hour Adjusted unit production : 2,411.36 cu. yds./hour <br />Unadjusted production : 2,905.25 cu. yds.lhour Adjusted fleet production : 4,822.72 cu. yds./hour <br />JOB TIME AND COBT <br />Fleet size : 2 dozers) Total job time : 8.53 hours <br />Unit cost : $0.070 per cu. yd. Total job cost : 52,899 <br />
The URL can be used to link to this page
Your browser does not support the video tag.