My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-01-29_REVISION - M1984043 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984043
>
2007-01-29_REVISION - M1984043 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:05:55 PM
Creation date
11/21/2007 9:02:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984043
IBM Index Class Name
Revision
Doc Date
1/29/2007
Doc Name
Conversion Approval
From
DRMS
To
Pelino, Inc.
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PRpJECT IDENTIFICATION <br />Task >R : 003 <br />Date : 0126/2007 <br />User: ESC <br />State :Colorado PenniUjob# :II~F1984043 <br />County : ChatiSee Abbreviation :none <br />Site :Jesse Lee Filename : M043-003 <br />Agency or organization name : DRMS <br />Permit or otherjob action :CN-01 <br />Task description : Rep/a <br />HOURLY EQUIPMENT COST <br />Topsoil on PAases 1l, 111 and /V <br />Basic machine :Cat D8R Series ll - 8SU (200: <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />AltachmeM no. 2 :3shank ripper <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Data source : (CRCs) <br /> Utilization % <br />Cost Breakdown : Ownership cosf/hour : $58.24 NA <br />Operatlng cosUhour: $73.75 100 <br />Ripper op, cost/hour : $0.00 0 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $184.77 Total fleet cosUhour : j329.54 <br />- <br />MATERIAL QUANTITIES <, , <br />Initial Swell Loose <br />volume : 15,500 LCY factor : NA volume : 15,500 LCY <br />Source of estimated volume : DRiNS Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 150 feet <br />Unadjusted hourty production : 834.3 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Matedal weight <br />Weight description <br />Decomposed rock - 25% Rock, <br />JOB TIME AND COST <br />Fleet size <br />Unit cost : $0.764 /LCY <br />f0.00 % (post <br />Operator skill : 0.75 (a~ <br />Material consistency : 1.00 (Cal <br />Dozing method : 1.00 (gc <br />Visibility: 1.00 (ae <br />Job efficiency : 0.83 (1 shil <br />Spoil pile : 0.80 (Inc <br />Push gradient : 0.79 (Cat <br />Attitude : 1.00 (Cat <br />Material weight : 0.87 (Cat <br />Blade type : 1.00 (S/S <br />Net correction : 0.34 <br />Adjusted unit production : 215.62 LCY/hr <br />Adjusted fleet production : 431.25 LCYRrr <br />Total job time : 35.94 Hours <br />Total job cost : j11,844 <br />
The URL can be used to link to this page
Your browser does not support the video tag.