My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-01-29_REVISION - M1984043 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984043
>
2007-01-29_REVISION - M1984043 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:05:55 PM
Creation date
11/21/2007 9:02:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984043
IBM Index Class Name
Revision
Doc Date
1/29/2007
Doc Name
Conversion Approval
From
DRMS
To
Pelino, Inc.
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatlna Software <br />PROJECT IDENTIp~ATION <br />Task # : 001 State :Colorado Pennit/job# : A/-1984-043 <br />Date : 01262007 County :Chaffee Abbreviatbn :none <br />User: ESC Site :Jesse Lee Filename:M043-001 <br /> <br />Agency or organization name : DBMS <br />Permit or other job action : CN-01 <br />Task description : 8ar:kf111 Slopes in Stages 11 and III to 3h:1 v <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D8R Series ll - 8SU (2001 Horsepower : 310 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : 3shank ripper <br /> Data source : (CRG) <br /> Utllizatton % <br />Cost Breakdown : Ownership wstlhour : $58.24 NA <br /> Operating cost/hour : $73.75 100 <br /> Ripper op.cosUhour: $0.00 0 <br /> Operator costmour : $32.78 NA <br /> Total unit cosUhour : 8164.77 Total fleet cosUhour : ?29.54 <br />Operator skill <br />Average push distance : 150 feet Material consistency <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method <br /> Visibility <br />Material consistency descrp8on : Job efficiency <br />ConsWidated stockpile Spoil pile <br /> Push gradient: <br />Average push gradient : 5.00 % (pos) Altitude <br />Average site altitude : 8,000 feet Matedal weight <br /> Blade type <br />Matedal weight : 2,650 Ibs/LCY Net correctbn <br />Weight description <br />Decomposed rack - 25% Rock, 75% Earth Adjusted unit production <br /> Adjusted fleet productfort <br />JOB TIME AND COST <br />247.63 LCYRv <br />485.28 LCY/hr <br />Fleet size : 2 Dozar(s) Total job time : 42.40 Hours <br />Unit cost : $0.665 /LCY Total Job cost : ;13,973 <br />
The URL can be used to link to this page
Your browser does not support the video tag.