Laserfiche WebLink
~.J <br />PHASES <br /> <br />Phase 2 - 24.88 +/- ac. (23.33 +/- ac. disturbed). <br />To be mined over a period estimated to be <br />about 6 to 8 years. Reclamation of Phase 1 <br />to comrence. Reclamation of Phase 2 to occur <br />upon co~letion of operations. <br />Concurrent Reclamation <br />Reclamation will occur in conjunction with the mining operation to the <br />extent practicable. The anticipated reclamation phasing plan is included <br />with the phases described above. However, because of the configuration of <br />the affected area, processing and stockpiling could remain in the same <br />general area of the pit throughout the life of the operation. In such an <br />event, concurrent reclamation in the Phase 1 area would be limited to the <br />side slopes and other areas not used for activities related to the <br />operation. <br />-7- <br />