My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV02355
DRMS
>
Back File Migration
>
Revision
>
REV02355
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:58 AM
Creation date
11/21/2007 9:00:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992102
IBM Index Class Name
Revision
Doc Date
12/28/1995
Doc Name
REGULAR 112 PERMIT APPLICATION CONVERSION
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Processina <br />If necessary, sizing of the rock will occur on site by using crushers <br />and screens. The product will then be stockpiled and raroved from <br />~' stockpiles as needed. A portable asphalt batch plant could also be <br />periodically located on the site if a demand arises for paving material. <br />The processing facilities may move as necessary along the pit floor to <br />accomfadate the operations. The Exhibit C map illustrates a typical <br />processing area setting. <br />Other than possible portable scales, it is not planned that any other <br />structures will be located on site. <br />Drainage Control <br />Because of the site's topographic setting, only relative minor <br />drainage control will be required. Refer to Exhibit G - Water Resources <br />for details. <br />Life of the Oaeration <br />It is estimated that about three to four acres will be disturbed per <br />year. On the basis of this rate of extraction, the life of the operation <br />is estimated to be approximately 11 to 15 years. However, the actual rate <br />of mining is based on market demands and subject to change accordingly. <br />\~] Phases of Mining and Reclamation <br />It is anticipated that there will be two phases of the operation as <br />follows: <br />PHASES <br />Phase 1 - 36.14 +/- ac. (29.46 +/- ac. disturbed). <br />To be mined beginning in the spring of 1996 <br />for a period estimated to be about 5 to <br />7 years. Reclamation of this Phase to <br />begin upon comnencemeirt of operations in <br />Phase 2. <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.