Laserfiche WebLink
<br />Mr. Steve S. Shuey <br />January 20, 1993 <br />Page 2 <br />within the application, was approved September 13, 1989. Revised permit <br />application materials included Volume 8 Surface Drainage Appendix <br />insertions and revised map 8-1. <br />Tec~nical revision TR-10, su}mitted to permit the acx~s road to the OVFdd <br />fan/water tank, was approved April 8, 1991. Revised permit application <br />materials included Volume 1 Section 2.05 pages 64 and 64A, Volwne 8 <br />Surface Drainage Appendix insertions, and Volume 8A Surfaoe Drainage <br />Appendix map 8A-8. <br />Technical revision'IR-11, sukmitted to address drainage plan modifications <br />on the West Ridge West Pile, was withdrawn prior to approval. <br />Technical revision TR-12, sutxnitted to revise the mine plan at Orc3~ard <br />Valley, was approved by the Division November 25, 1991. Revised permit <br />application materials included Volume 1 Section 2.05 pages 1-15, Volume 2A <br />pages 13-22, and numerous maps, tables, and figures in Volimies 2, 2A, 3, <br />4, and 9 (see decision form). <br />`Perhnical revision TR-13, sulinitted to address an AVF designation and <br />incidental boundary revision, was approved July 11, 1991. Revised permit <br />application materials included Volume 1 Permit Area legal Description page <br />3 and revised maps 8-3 and 8A-8. <br />Technical revision TR-14, sulinitted to address the drainage control plan <br />and associated documentation rein ' ed, was approved February 2, 1992. <br />Revised permit application materials included Volume 8 Surface Drainage <br />Appendix insertions and revised maps 8-lA, 8-2, and 8-3. <br />Technical revision TR-15, sulsnitted to address installation of a new <br />ventilation fan at the OVWM, was approved August 6, 1991. Revised permit <br />application materials included Volume 1 Section 2.05 page 16A, Volume 6A <br />Phase III Stability Appendix Reclamation Ousts pages, aryl revised map 8-7. <br />Technical revision TR-16, suimitted to address a reduction in subsidence <br />monitoring requirements, was approved February 11, 1992. Revised permit <br />application materials included Volume 1 Section 2.05 pages 146 and 147. <br />Technical revision TR-17, sulinitted to address the Panel B mine plan <br />modification, was approved Mardi 27, 1992. Revised permit application <br />materials included Volume 1 Section 2.05 pages 1, lA, 2, 142, 157, aryl <br />159-161, Volume 2 Geology and Mine Planning Appendix insertions, and <br />revised map 2-5. <br />Ted~nical revision TR-18, suUnitted to address the RAM coal stockpile <br />haul road design inadequacies, is currently in the review process. <br />`Peclv~ical revie~r TR-19, submitted to address the Panel C mine plan <br />