Laserfiche WebLink
Mr. Steve S. Shuey <br />Januazy 20, 1993 <br />Page 3 <br />modification, was approved August 21, 1992. Revised permit <br />applicationmaterials included Volume 1 Section 2.05 pages 1, lA, 2, 142, <br />156, 157, and 159, Volume 2 Geology and Mine Planning a~*,rr;Y insertions, <br />and revised map 2-5. <br />'Dec3rnical revision TR-20, sukmitted to address small area exemption <br />docwoentation rerniirements, is currently in the review process. <br />Minor Revisions• <br />Minor revision ME2-58, suhnitted to address the installation of an oversize <br />coal chute on the conveyor belt above the crushing and screerurrg level, <br />was approved September,9, 1988. Revised permit application materials <br />included Volume 1 Section 2.05 page 18, and Volume 6A Phase III Stability <br />Appendix Reclamation Costs T`as}c 140A worksheet. <br />Minor revision MR-59, sutmitted to address construction of a temporary <br />coal stockpile, was approved September 20, 1988. Revised permit <br />application materials included Volrmie 1 Section 2.05 page 18. <br />Minor revision MR~iO, sulmitted to address reoonstnx,-tion of the West <br />Ridge Waste Pile, was withdrawn prior to approval. <br />Minor revision MR-61, submitted to address the expa~tision of the oversized <br />coal stockpile above the crustrinq and screening level, was approved March <br />2, 1989. Revised permit application materials included Volume 1 Section <br />2.05 page 22, and revised map 8-1. <br />Minor revision MR-62, submitted to address repair of the W~d~l portal art <br />failure, was approved June 9, 1989. Revised permit application materials <br />included Volume 1 Section 2.05 pages 19 and 19A. <br />Minor revision MR-63, submitted to address a w~ control plan, was <br />approved July 22, 1989. Revised permit application materials included <br />Volume 1 Section 2.05 page 74. <br />Minor revision MR-64, submitted to address the relocation of a belt magnet <br />and the associated corx.-rete work, was approved August 10, 1989. Revised <br />permit application materials included Volume 1 Directory of Maps page 4, <br />and revised map 8-6A. <br />Minor revision MR-65, submitted to address the relocation of a topsoil <br />pile and the associated diversion/collection ditches, was approved May 7, <br />1990. Revised permit application materials included Volume 1 Section 2.05 <br />pages 19, 19A, 19B, aryl 19C, and revised map 8-6. <br />:,~: <br />~~ <br />.;W <br />Minor revision MR-66, sutmitted to address the construction of a ccamsrt <br />fueling pad and the establishment of a R-0-M coal stockpile, was approved <br />