Laserfiche WebLink
• Colorado Division of Minerals erd Geolo~ <br />ESTIMATING FORM - BULLD02ER NORK <br />Task #: 1 Prep. by: JD Task Fi Le Name: M201-1 <br />Date: 12/21/95 Permit #: M80201 Mine: O'Bemon Pit <br />Permit Action: final Reclamation <br />Task Description: Reduce Xighwalls to 3:1 <br />HOURLY EQUIPMENT COST <br />_____________________ Basic Machine: Cet D7G Horsepower: 200 <br />Blade Type: GTRAI GHT -------~~ <br />Attachment #1: BOPS Ceb Shift Basis: 1/day <br />Attachment #2: N/A --------~ <br />Cost Breakdown: <br />-------------- Utilization X <br />Ownership cost/hr = f29.33 N/A <br />Operet ing 8 overhaul cost/hr• dozer = f34. 10 100 <br />-ripper = 50.00 N/A <br />Operator cost/hr = 522.95 N/A <br />Total egpt. unit cost/hr = 586.37 Total fleet cost/hr: 586.37 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Yolume: 12,500.0 BCY Factor: 1.250 Volume: 15,625.0 LCY <br />Source of quantity take-off: Calculation <br />Source of est. swell factor: Program <br />HOURLY PRODUCTION <br />_________________ Job Condition Correcti on Factors <br />Avg. push distance: 50 ft. ---------------------- ---------- <br />- -------- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 0.90 ([at tbl) <br />dozer production:' 800 LCY/hr Dozing method..... 1.20 (slot) <br />- -------- Visibility........ 1.00 (avg.) <br />Material consistency: Job efficiency.... 0.83 (1sh/day) <br />Compac tad fill or embankment Spoil pile factor. 1.00 (doz-oc) <br />--------------------- ---------------- Push gradient..... 1.33 (Cat tbl) <br />Avg. push gradient: 15.00 X (nag) Altitude deration. 0.94 (Cat tbl) <br />- -------- Materiel weight... 1.00 (Cat tbl) <br />Avg. site altitude: 8000 ft. Blade type........ 1.00 (S, SU,U) <br />Material weight 2300.00 lb/LCY Net Job Correction 0.84 <br />Met. Descr.: - ---- ----------~ <br />GENERAL FILL Adjusted Unit Prod.: 671.72 LCY/hr <br /> Adjusted Fleet Production: 671.72 LCY/hr <br />JOB LOST ----------- <br />Fleet size 1 Dozers) Total Job Time: 23.26 <br />-----'----- Hours <br />- <br />Unit Cost -"""--- <br />50.129 /LCY Total Job Cost: 52,009.19 <br />