Laserfiche WebLink
Colorado Division of Minerals end Geol o~ <br />EST MUTING FORM - BULLD02ER YORK <br />Task #: 2 Prep. by: JD <br />Date: 72/21/95 Permit #: M80207 <br />Permit Action: Final Reclamation <br />Task Description: Level loadout ramp <br />HOURLY EDUI PNENT COST <br />Task File Name: M207-2 <br />Mine: O~Barogn Pit <br />Basic Machine: Cet D7G <br />Blade Type: STRAIGXT <br />Attachment #7: ROPS Cab <br />Attachment #2: N/A <br />Horsepower: 200 <br />Shift Basis: 1/day <br />Cost Breakdown: <br />------------- Utilization X <br />Ownership cost/hr = 529.33 N/A <br />Operating 8 overhaul cost/h r- dozer = f34.70 100 <br /> -ripper = 50.00 N/A <br />Operator cost/hr = 522.95 N/A <br />Total egpt. unit cast/hr = f86.37 Total fleet cost/h r: f86.37 <br />MATERIAL DUANTITIES <br />___________________ <br />___________________ <br />Initial <br />Swell <br />Loose <br />Volume: 700.0 BCT Factor: 1.250 Volume: 125.0 LCY <br />Source of quantity rake-off: Calculation <br />Source of est. swell factor: Program <br />HOURLY PRODUCTION <br />_________________ Job Condition Correction Factors <br />Rvg• push distance: 100 ft. ------------------------- ------- <br />--------- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 0.90 (Cat tbl) <br />dozer production: 445 LCY/hr Dozing method..... 7.20 (slot) <br />--------- Visibility........ 1.00 (avg.) <br />Materiel consistency: Job efficiency.... 0.83 (1sh/day) <br />Compacted fill or e~enkment Spoil pile faetor. 7.00 (dax-oe) <br />----------------------------- -------- Push Gradient..... 0.99 (Cat tbl) <br />Avg. push gradient: 1.00 X (pos) Altitude deration. 0.94 (Cat tbl) <br />--------- Material weight-.. 1.00 (Cat tbl) <br />Avg. site altitude: 8000 ft. Blade type........ 1.00 (S, SU,U) <br />Material weight 2300.00 Lb/LCY Net Job Correction 0.62 <br />Mat. Desc r.: --------- --- ----~~-- <br />GENERAL FILL Adjusted Unit Prod.: 278.27 LCY/hr <br /> Adjusted Fleet Production: 278.27 LCY/hr <br />JOB COST --- -------- <br />Fleet size 7 Dozers) Total Job Time: 0.45 Hours <br />Unit Cost 50.310 /LCY Totat Job Cost: E38.80 <br />